Job Aborted after 50 errors logged topic

Post questions here relative to DataStage Server Edition for such areas as Server job design, DS Basic, Routines, Job Sequences, etc.

Moderators: chulett, rschirm, roy

Post Reply
snassimr
Premium Member
Premium Member
Posts: 281
Joined: Tue May 17, 2005 5:27 am

Job Aborted after 50 errors logged topic

Post by snassimr »

Hi , everybody !!!

I get some strange DS behaviour .

I run some job with Job Sequence . After 50 warnings the job aborted due 50 warnings limit and I see in Job Sequence log the following row : "Mode (row/warn limits) = 0/50".
But where the limit was set . I dont know the way to set this limit from Job Sequence. So from where it has come and how to remove the limit . I can allow the job running after 50 warnings.

If anybody know the way to set limits from job sequence ?
How to remove tthe limit in my case ?

Thanks,Nissim
ray.wurlod
Participant
Posts: 54607
Joined: Wed Oct 23, 2002 10:52 pm
Location: Sydney, Australia
Contact:

Post by ray.wurlod »

In the Job Run Options dialog, set Limits on the Limits tab.
In Director, change the defaults via Tools > Options, which a Search would have discovered.

Even better, design jobs that don't generate warnings in the first place.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Post Reply