Page 1 of 1

problem with director

Posted: Tue Jan 08, 2008 11:34 am
by vsi
Hi, Right now we are having 4 users when ever we open a director it is taking lot of time around minimum 4 min to open director from designer, Please let me know how can it be fixed.

Thanks,
VSI

Posted: Tue Jan 08, 2008 12:34 pm
by ArndW
The director refresh speed has always been the Achilles Heel in DataStage since version 0.0.0

Adding categories and putting jobs in them as well as filtering the entries displayed help refresh speeds. Cleaning up log files also helps.

How many jobs (and instances of the jobs) do you have in the view which takes a long time? Do you have categories and if so, do you have the categories view in the director active?

problem with director

Posted: Wed Jan 09, 2008 8:09 am
by senthilt1
HI VSI,

My Suggestion is,

1) Take a copy of your job and delete the original and rename the copy of your job to the old name. Then try running the jobs and open the director. It would solve your problem.

2)Delete all the old logs for each job in the director.

Thanks,

Warm Regards

Posted: Wed Jan 09, 2008 8:14 am
by chulett
Cleaning up logs won't help the initial display of Director in the Status view. When you check specific logs, sure, but it has nothing to do with how long it takes to just display the status of all jobs.

As Arnd notes, it's all about using Categories well and the number of jobs in whatever Category you were in the last time you were in the Director. Best to answer his questions if you need further help on the subject.

It can also be slow if you are not local to the DataStage Server - for example, if you access things via a WAN it *will* be slow, regardless.

Posted: Wed Jan 09, 2008 5:00 pm
by vsi
Thanks Craig,
we have around 340 jobs in a category and also we are facing issues in renaming the jobs it is taking around 3 to 4 min.

Posted: Thu Jan 10, 2008 6:20 am
by ArndW
340 jobs in a category will significantly degrade Director performance. Try to break that down into several categories (perhaps ~50 jobs per category) and you will notice a significant improvement.

Posted: Thu Jan 10, 2008 8:58 am
by chulett
I'd also still be curious if you are local to your DataStage Server or not?