Max no of jobs that can run in parallel ?
Posted: Sun Aug 19, 2007 11:19 pm
Hi,
just a quick one. is there any limitations on the number of jobs that can run in parallel in DS both in server and parallel edition and can you limit the jobs that can run in parallel at a given time ? if i want to limit DS to run no more than 5 jobs at the same time in parallel .i.e. 5 jobs start to run at the same time. 4 are still running and one finishes. DS selects one more job from the pool and runs it such that at any given time only 5 jobs can run at the same time . is this possible ?
just a quick one. is there any limitations on the number of jobs that can run in parallel in DS both in server and parallel edition and can you limit the jobs that can run in parallel at a given time ? if i want to limit DS to run no more than 5 jobs at the same time in parallel .i.e. 5 jobs start to run at the same time. 4 are still running and one finishes. DS selects one more job from the pool and runs it such that at any given time only 5 jobs can run at the same time . is this possible ?