Changing autopurge settings

Posted: Mon Aug 06, 2007 9:56 am
by RodBarnes
Is there a way to change the autopurge settings for all existing jobs in a project?

I know you configure the initial autopurge settings in Administrator for a project and those settings are used when a job is created (right?). However, after a job has been built and you want to change the autopurge settings, I've only found the option in Director under "Job -> Clear Log..." where you can change the settings for an individual job.

I see the [AUTO-PURGE] settings in DSParams. But I assume that is the file updated from Administrator since it is project wide?

Thanks. [I did not find anything via a search.]

Re: Changing autopurge settings

Posted: Mon Aug 06, 2007 11:05 am
by gateleys
You may want to check Kenneth Bland's website for a utility that he has developed. I have used it and it works wonderfully. You will have to register in his site to get to the tips and tricks (or is it the tools?) page.

Posted: Mon Aug 06, 2007 11:09 am
by chulett
Was just going to post the same thing. I could have sworn it was posted here, but couldn't find it. It used to be available at the old DataStageXchange site but is 'No longer available' there. :(

Posted: Mon Aug 06, 2007 11:18 am
by gateleys
chulett wrote:Was just going to post the same thing. I could have sworn it was posted here, but couldn't find it. It used to be available at the old DataStageXchange site but is 'No longer available' there. :(
OK.. here is what Kenneth had to say -

viewtopic.php?t=106690

Posted: Mon Aug 06, 2007 12:47 pm
by RodBarnes
Thanks to all. Exactly what I needed. Figured someone had already done this before. :wink:

Posted: Mon Aug 06, 2007 1:10 pm
by chulett
Thanks Gateleys. I'd searched for the KBA utility name, figured that would be included in any post with the code. When that didn't turn anything up and you posted, I stopped searching. Thanks for providing the link.