Page 1 of 1

Link execution order

Posted: Thu Feb 08, 2007 8:00 am
by Magesh_bala
Hi,

I have two links from Sybase stage,i want to know that which one will execute first.

Whether i can control my execution order.

Posted: Thu Feb 08, 2007 8:05 am
by DSguru2B
I dont think you can control the execution in your case. Link ordering controls which link will be fired first but that option is only present with the transformer stage.

Posted: Thu Feb 08, 2007 8:06 am
by chulett
Simultaneous.

Posted: Thu Feb 08, 2007 9:41 am
by srimitta
To some extent you can control delay in loading:

1). Change Out put Link Execution Order in Transform stage.
(This is active only if you have more one output links)

2).Write Link data (the link one you want to delay) to sequence file before
loading into your Sybase DB table.