Hi,
I Have a Sequencer which is scheduled daily and the sequencer runs few jobs. I'm trying to know if a job fails in a sequence then how can we make the status of the sequence as failed. As generally when a job fails in a seqence the log show the status of the job but still sequencer status is success. As we are doing Scheduling based on Sequencer Status, so we wont be able to catch if the job fails as Sequencer still shows Success Status.
Any Ideas please.
Thanks
I Have a Sequencer which is scheduled daily and the sequencer runs few jobs. I'm trying to know if a job fails in a sequence then how can we make the status of the sequence as failed. As generally when a job fails in a seqence the log show the status of the job but still sequencer status is success. As we are doing Scheduling based on Sequencer Status, so we wont be able to catch if the job fails as Sequencer still shows Success Status.
Any Ideas please.
Thanks