Hi gurus,
i want to use variables in sequence.
so used USER VARIABLE ACTIVITY.Actually i want to declare a variable called status and assign it value .
if status =1 then job1 else job2.
user variable activity---->jobactivity1---->jobactivity2.
is my design correct, plz help me and how can i declare this variable.
plz help me.
cheers;
vijay
i want to use variables in sequence.
so used USER VARIABLE ACTIVITY.Actually i want to declare a variable called status and assign it value .
if status =1 then job1 else job2.
user variable activity---->jobactivity1---->jobactivity2.
is my design correct, plz help me and how can i declare this variable.
plz help me.
cheers;
vijay
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
In case you still want to use a User Variables activity, be aware that it has the wierdest grid control - it's completely blank when opened (no grid). You have to right-click and choose Add New Row.
That's how you declare a variable in a User Variables activity. Fill in the variable name and its derivation expression once you've created the new row for it.
![Rolling Eyes :roll:](./images/smilies/icon_rolleyes.gif)
That's how you declare a variable in a User Variables activity. Fill in the variable name and its derivation expression once you've created the new row for it.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
-
- Participant
- Posts: 228
- Joined: Tue Oct 03, 2006 7:08 pm
Hi Gurus,
thanks very much.iam only using nested condition.
iam going by this design.
nested condition--->jobactivity1---->jobactivity2.
in the nested condition i have choosen expression type as CUSTOM-(CONDITIONAL)
i have declared expression as if job1.$userstatus=1 then job1 else job2.
while validating expression iam getting error as EXPECTED EXPRESSION.
plz help me in validating expression and is my design correct am i going in the right way.
cheers;
vijay
thanks very much.iam only using nested condition.
iam going by this design.
nested condition--->jobactivity1---->jobactivity2.
in the nested condition i have choosen expression type as CUSTOM-(CONDITIONAL)
i have declared expression as if job1.$userstatus=1 then job1 else job2.
while validating expression iam getting error as EXPECTED EXPRESSION.
plz help me in validating expression and is my design correct am i going in the right way.
cheers;
vijay
Use these in your expressions in the Nested Condition Activity
You should be good.
Code: Select all
- job1.$userstatus=1 (for jobactivity1)
- Otherwise (for jobactivity2)
Narasimha Kade
Finding answers is simple, all you need to do is come up with the correct questions.
Finding answers is simple, all you need to do is come up with the correct questions.
Oh, Your need to change your job design. Use this (Check the expression values from my previous post)
Instead of using
Code: Select all
NestedConditionActivity------>jobactivity1
|
|
|-------->jobactivity2
Code: Select all
nested condition--->jobactivity1---->jobactivity2
Narasimha Kade
Finding answers is simple, all you need to do is come up with the correct questions.
Finding answers is simple, all you need to do is come up with the correct questions.
-
- Participant
- Posts: 228
- Joined: Tue Oct 03, 2006 7:08 pm
HI GURUS,
THANKS VERY MUCH.
actually when i used 'job1.$userstatus=1' i could validate the expression, but when i see the director log, its simply running the job2, it checking job2 initially, its saying since the result status is 1 finished executing job.
is that the expected result, actually it should also run job1 and should check the status i think, plz help me if iam wrong.
cheers;
saama
THANKS VERY MUCH.
actually when i used 'job1.$userstatus=1' i could validate the expression, but when i see the director log, its simply running the job2, it checking job2 initially, its saying since the result status is 1 finished executing job.
is that the expected result, actually it should also run job1 and should check the status i think, plz help me if iam wrong.
cheers;
saama
-
- Participant
- Posts: 228
- Joined: Tue Oct 03, 2006 7:08 pm
HI GURUS,
i have given sequence a name like job4.
this is what iam able to view from the log of this job.
JOB4 -> (job2): Job run requested
Mode (row/warn limits) = 0/0
Job Parameters --->
DSJobController=JOB4.
this is what iam getting. why is it not checking JOB1, its simply starting job2.
cheers;
vijay
i have given sequence a name like job4.
this is what iam able to view from the log of this job.
JOB4 -> (job2): Job run requested
Mode (row/warn limits) = 0/0
Job Parameters --->
DSJobController=JOB4.
this is what iam getting. why is it not checking JOB1, its simply starting job2.
cheers;
vijay
There must be something wrong with how you are setting your UserStatus in your job.vijaykumar wrote:actually when i used 'job1.$userstatus=1' i could validate the expression, but when i see the director log, its simply running the job2, it checking job2 initially, its saying since the result status is 1 finished executing job.
Narasimha Kade
Finding answers is simple, all you need to do is come up with the correct questions.
Finding answers is simple, all you need to do is come up with the correct questions.
Narasimha, what makes you think that UserStatus is involved in any of this?
All Vijay ever said was:
Vijay, you need to explain a little more clearer where the value of this status variable is getting set... and how you want to use it to control the execution of these two jobs.
![Confused :?](./images/smilies/icon_confused.gif)
All Vijay ever said was:
User Variables stage. A variable called status. Then you sidetracked everything with an assumption of 'User Status'. At least it seems like you got the links properly separated, now we just need to know how this 'status' variable is getting set so the last of this can get straightened out as well.i want to use variables in sequence. so used USER VARIABLE ACTIVITY.Actually i want to declare a variable called status and assign it value .
Vijay, you need to explain a little more clearer where the value of this status variable is getting set... and how you want to use it to control the execution of these two jobs.
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers
Oops... My bad....Sorry about that Vijay.
Thanks for correcting me Craig.
If I understood it right this time, your new design could be.
Conditions in your NestedConditionActivity would be
As Craig said, you need a way to set the value for 'status'.
How do you want to set a value for this variable?
Thanks for correcting me Craig.
If I understood it right this time, your new design could be.
Code: Select all
UserVariablesActivity------->NestedConditionActivity------>jobactivity1
|
|
|----------------------->jobactivity2
Conditions in your NestedConditionActivity would be
Code: Select all
Expression Type Expression
------------------ -------------
Custom - (Conditional) UserVariablesActivity.Status=1
Otherwise N/A
How do you want to set a value for this variable?
Narasimha Kade
Finding answers is simple, all you need to do is come up with the correct questions.
Finding answers is simple, all you need to do is come up with the correct questions.
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: