Hi All,
Can someone please tell me where to get a good documentation on this?
Regards
Kay
BACKING UP A DATASTAGE VERSION CONTROL REPOSITORY
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 17
- Joined: Mon Jan 16, 2006 2:11 pm
- Contact:
BACKING UP A DATASTAGE VERSION CONTROL REPOSITORY
ARSENAL GUNNERS GOONER
Actually, there *is* more to it than just that, as it is not a 'normal' project. If all you do is an export, you won't have a working VC project when you reimport. You need to make sure you also backup the special hashed files inside the project that make it a Version Control project - and they all start with APM:
APM.BATCH
APM.BATCH.MEMBERS
APM.VERSION
APM.VERSION.XREF
APM.BP
This can simply be done at the O/S level with your favorite filesystem backup utility. Or you could write jobs to export their contents periodically and then matching jobs to reload them after recovery of the project.
APM.BATCH
APM.BATCH.MEMBERS
APM.VERSION
APM.VERSION.XREF
APM.BP
This can simply be done at the O/S level with your favorite filesystem backup utility. Or you could write jobs to export their contents periodically and then matching jobs to reload them after recovery of the project.
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers