Named pipes in Parallel jobs!!!

Post questions here relative to DataStage Server Edition for such areas as Server job design, DS Basic, Routines, Job Sequences, etc.

Moderators: chulett, rschirm, roy

Post Reply
pkothana
Participant
Posts: 50
Joined: Tue Oct 14, 2003 6:12 am

Named pipes in Parallel jobs!!!

Post by pkothana »

Hi All,
Can we read from a named pipe in a parallel job? I have seen that in Sequential file stage of server jobs, there is a check box for specifying that data has to be read using named pipes. Is there anything equivalent to this available in Parallel jobs?

Also, we are planning to migrating to DS version 7. I was wondering if this facility is there in version 7 PX jobs.

Thanks in Advance
Regards
Pinkesh
bigpoppa
Participant
Posts: 190
Joined: Fri Feb 28, 2003 11:39 am

Named pipes in Parallel jobs

Post by bigpoppa »

It was available in the "import" stage in 6.0. I think the "import" stage was replaced by the sequential file stage in PX, so if the option exists, it should be availabe in the seq file stage.

Can anyone verify this?

BP
Post Reply