Hi,
We have a master sequence which calls a number of jobs as well as sequences. If a job directly called from master sequence fails, we see its status as 3[Aborted] in Director log of master sequence. But if a job called from a child sequence fails, we see status for that sequence as success in our master sequence logs.
Is there a way by which we can see a warning or anything in Director logs of Master Sequence to deduce that a job called by child sequence has failed?
Thanks.
Getting Warnings/Job Finished status of child Sequences
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Checking "log warnings after activities that finish with status other than OK" in every job sequence is my preferred way of making warnings (as well as errors) visible "up the chain of control".
I try always to create jobs that don't abort.
I try always to create jobs that don't abort.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: