Hi,
I want to schedule jobs in datastage, can you guide me how to schedule the jobs in Datastage Server Edition ?
How to schedule jobs in Datastage
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Method 1. Use Director client Schedule view. This is an interlude to the operating system's scheduler.
Method 2. Use any third-party scheduler (or the operating system scheduler) and the dsjob command line interface to request your job runs.
Method 2. Use any third-party scheduler (or the operating system scheduler) and the dsjob command line interface to request your job runs.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.