I have DS 7.5 running on windows. I have some sequencer jobs scheduled to run everyday and they were failing to get triggered. Can you help me to figure out as why scheduling doesn't work....The same was working for the past 2 years and it stopped working for the couple of days.But when i start the job manually it works....Can any one please help me with this.
Thanks in Advance
The production machine went down during that time.The OS was corrupted and backup was restored and also some hardware part has to be replaced .so does it mean should i start some services of datastage or what could it be?.Kindly help
I assume that the AT schedule is gone. Re-enter your scheduling from DataStage (actually, do the old schedules still show in the director?).
Did you enter the "AT" command from a shell to see what entries are present?
I got the issue.
Actually a file called vmdsr_sched.exe is missing in the path where the windows scheduler looks for.This may be due to some patch updates of any application in the system. So i had to replace the exe file in the path required, by copying the exe file from my development environment machine