Hi , everybody !!!
I get some strange DS behaviour .
I run some job with Job Sequence . After 50 warnings the job aborted due 50 warnings limit and I see in Job Sequence log the following row : "Mode (row/warn limits) = 0/50".
But where the limit was set . I dont know the way to set this limit from Job Sequence. So from where it has come and how to remove the limit . I can allow the job running after 50 warnings.
If anybody know the way to set limits from job sequence ?
How to remove tthe limit in my case ?
Thanks,Nissim
Job Aborted after 50 errors logged topic
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
In the Job Run Options dialog, set Limits on the Limits tab.
In Director, change the defaults via Tools > Options, which a Search would have discovered.
Even better, design jobs that don't generate warnings in the first place.
In Director, change the defaults via Tools > Options, which a Search would have discovered.
Even better, design jobs that don't generate warnings in the first place.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.