Post by ray.wurlod »

I dont think so, because I have been able to see this even with the patch installed for SP2. Nonetheless, you need the patch for other reasons, particularly Job activities in job sequences.
If you click on the single icon in each folder of the Palette, you get everything in the stage types branch of the Repository, in alphabetical order - so you don't lose any design functionality. You could also select stages from the Repository tree view (Stage Types branch).
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
chulett
Charter Member
Charter Member
Posts: 43085
Joined: Tue Nov 12, 2002 4:34 pm
Location: Denver, CO

Post by chulett »

As noted, I sincerely doubt the patch will help with that but you should apply it regardless.

I never pick job or routine names from inside an Activity stage any more. Not once I found out all you had to do was click and drag the job or routine onto the Sequence canvas from the Repository window and DS does that automagically for you. Check it out. :wink:
-craig

"You can never have too many knives" -- Logan Nine Fingers
elavenil
Premium Member
Premium Member
Posts: 467
Joined: Thu Jan 31, 2002 10:20 pm
Location: Singapore

Post by elavenil »

Yes Craig. That is what i am currently doing and that is good as well as it avoids one step, which is placing the job activity and assign the job. :)

Regards
Elavenil
DSguru2B
Charter Member
Charter Member
Posts: 6854
Joined: Wed Feb 09, 2005 3:44 pm
Location: Houston, TX

Post by DSguru2B »

chulett wrote:As noted, I sincerely doubt the patch will help with that but you should apply it regardless.

I never pick job or routine names from inside an Activity stage any more. Not once I found out all you had to do was click and drag the job or routine onto the Sequence canvas from the Repository window and DS does that automagically for you. Check it out. :wink:
Going through a list of 500+ jobs in another challenge. The drag and drop method is very convinent, no doubt.