hi all,
iam getting this controller problem ,while trying to run a sequencer.
what can be the problem ??
iam getting this controller problem ,while trying to run a sequencer.
what can be the problem ??
Last edited by prasanna2100 on Tue Jun 13, 2006 12:11 am, edited 1 time in total.
Re: Sequencer Issue
Are you sure you are using DS390? as you cannot create sequence jobs in MVS enviroment.If you are using either serv/parallel edition let us know the specific error you are getting.prasanna2100 wrote:hi all,
iam getting this controller problem ,while trying to run a sequencer.
what can be the problem ??
Kris
Where's the "Any" key?-Homer Simpson
Where's the "Any" key?-Homer Simpson
-
- Participant
- Posts: 36
- Joined: Mon Mar 27, 2006 12:23 am
- Location: Chennai
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
So what's the problem?
A Sequencer can only make an "any or all" decision on its inputs. There's naught that can go wrong with it.
I suspect you mean "job sequence".
A Sequencer can only make an "any or all" decision on its inputs. There's naught that can go wrong with it.
I suspect you mean "job sequence".
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
-
- Participant
- Posts: 36
- Joined: Mon Mar 27, 2006 12:23 am
- Location: Chennai
i have developed q squencer with 12 independent jobs.
while executing the sequencer iam getting this error
SEQ_J_TFM_F41003..JobControl (@J_TFM_F41003): Controller problem: Error calling DSRunJob(J_TFM_F41003_Trim), code=-14
>>
>>[Timed out while waiting for an event]
>>
>>SEQ_J_TFM_F41003..JobControl (fatal error from @Coordinator): Sequence job will abort due to previous unrecoverable errors
>>
>>then the sequnce aborts
>>
>>when I run individually the sequence it executes. Please suggest.
while executing the sequencer iam getting this error
SEQ_J_TFM_F41003..JobControl (@J_TFM_F41003): Controller problem: Error calling DSRunJob(J_TFM_F41003_Trim), code=-14
>>
>>[Timed out while waiting for an event]
>>
>>SEQ_J_TFM_F41003..JobControl (fatal error from @Coordinator): Sequence job will abort due to previous unrecoverable errors
>>
>>then the sequnce aborts
>>
>>when I run individually the sequence it executes. Please suggest.
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
How many CPUs are in your DataStage server machine?
If this is a small number, and you are asking it to do so many things at once, is it any wonder it reports being overloaded?
Can you juggle two balls? Three? Twelve?!!
A design such as that below guarantees that at most two jobs at a time will be running.
If this is a small number, and you are asking it to do so many things at once, is it any wonder it reports being overloaded?
Can you juggle two balls? Three? Twelve?!!
A design such as that below guarantees that at most two jobs at a time will be running.
Code: Select all
Job Activity ---> Job Activity ---> JobActivity ---> Job Activity
Job Activity ---> Job Activity ---> JobActivity ---> Job Activity
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
-
- Participant
- Posts: 36
- Joined: Mon Mar 27, 2006 12:23 am
- Location: Chennai
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Yes.
You, too, can have it by the simple expedient of searching the forum.
It may be more efficient to use both phantom and &PH& and perform a search for all terms.
This probably should have been a new thread.
You, too, can have it by the simple expedient of searching the forum.
It may be more efficient to use both phantom and &PH& and perform a search for all terms.
This probably should have been a new thread.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
-
- Participant
- Posts: 232
- Joined: Fri Sep 30, 2005 4:52 am
- Contact:
-
- Charter Member
- Posts: 560
- Joined: Wed Jul 13, 2005 5:36 am
- Location: Ohio
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Not concurrency, just total load. Monitor your operating system to determine where the bottlenecks are; CPU, memory, I/O throughput, network bandwidth are the primary candidates.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
-
- Charter Member
- Posts: 560
- Joined: Wed Jul 13, 2005 5:36 am
- Location: Ohio
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: