DSguru2B wrote:Job5 is not able to pickup the parameters because it is not in the format that it requires. It should be pipe delimited. Gateleys provided you with the correct format.
gateleys wrote:
Notice that you must create and string to define all your parameter as :
" Paremeter = value | parameter2 = value | paramenter3 = value | ...| ParamenterN = ValueN"
In order to bring your parameters in that format, you have to use the command that gateleys provided
From the error it looks like you have not defined the parameter COL_B.
Make sure you are hardcoding the correct parameter names when you call the UtilityRunJob().
Try this
DSguru2B wrote:Job5 is not able to pickup the parameters because it is not in the format that it requires. It should be pipe delimited. Gateleys provided you with the correct format.
gateleys wrote:
Notice that you must create and string to define all your parameter as :
" Paremeter = value | parameter2 = value | paramenter3 = value | ...| ParamenterN = ValueN"
In order to bring your parameters in that format, you have to use the command that gateleys provided
Yes you can use UtilityJobRun transform function for parallel job too orelse as suggested by DSGURU2B you can pass these values through the unix script.
Yes you can use UtilityJobRun transform function for parallel job too orelse as suggested by DSGURU2B you can pass these values through the unix script.
Thanks
Sam
I dont see the UtilityJobRun transform function in the transformer stage ,it is in user variable activity stage ,but dont know how to pass teh parameters from sequential file.