How to run a job with no limit as warning
Moderators: chulett, rschirm, roy
-
- Premium Member
- Posts: 149
- Joined: Fri Oct 15, 2004 12:13 am
- Location: Toronto,divine_auro@yahoo.co.in
- Contact:
How to run a job with no limit as warning
Dear All,
Please any one can let me know how to run a job with unlimited warning limit. As when I am selecting with no limit still the job aborts after 50 limits. I know there will be other way to handle this problem as to call wait for file. But in this point I want to run the job with no limit. If any one has any idea please do help me.
Please any one can let me know how to run a job with unlimited warning limit. As when I am selecting with no limit still the job aborts after 50 limits. I know there will be other way to handle this problem as to call wait for file. But in this point I want to run the job with no limit. If any one has any idea please do help me.
With Regards
Biswajit
Biswajit
Are you running the job from Director or from job control. If you think changing it in Director affects how it runs under job control you are mistaken.
If you are starting the job using Director, set the abort limit. If you are running it from a Sequencer job, dsjob command line, or a Batch job, then you must set the warning limits there.
If you are starting the job using Director, set the abort limit. If you are running it from a Sequencer job, dsjob command line, or a Batch job, then you must set the warning limits there.
Kenneth Bland
Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: