Code: Select all
_______ _______ _______
| |---------| | | |
| OCI |---------| LC |----------| SEQ |
|_____|---------|_____| |_____|
Code: Select all
XF_CDM_EPCC_EXPNS_test..OCI_EV_CC_EXP_EXTRACT: Oracle Error - OCI_INVALID_HANDLE
If I redesign the job to use 3 OCI stages instead of one stage with 3 links, IT WORKS I haven't changed the connection details or the SQLs - I simply copy/paste the original OCI twice, deleted the unwanted links, and hooked them up to the Link Collector.
I suspect it is a bug. I'm using DS 7.5.1A with Oracle 10.1. Can anyone confirm or disprove this?