Monitoring %CP

Post questions here relative to DataStage Server Edition for such areas as Server job design, DS Basic, Routines, Job Sequences, etc.

Moderators: chulett, rschirm, roy

Post Reply
snassimr
Premium Member
Premium Member
Posts: 281
Joined: Tue May 17, 2005 5:27 am

Monitoring %CP

Post by snassimr »

Hi !

In Monitoring Window of Director I can See %CPU .

What the value is shown after the job finished ? Max value of cpu usage,average,minimum during the job's run ?
ArndW
Participant
Posts: 16318
Joined: Tue Nov 16, 2004 9:08 am
Location: Germany
Contact:

Post by ArndW »

snassimr,

it shows the average; taking the ratio of Wall-Clock time and CPU time used.
ray.wurlod
Participant
Posts: 54607
Joined: Wed Oct 23, 2002 10:52 pm
Location: Sydney, Australia
Contact:

Post by ray.wurlod »

Be aware that this value - and the rows per second value - is skewed by operational overheads and sampling interval. The shorter the job the worse are these biasing effects.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
ArndW
Participant
Posts: 16318
Joined: Tue Nov 16, 2004 9:08 am
Location: Germany
Contact:

Post by ArndW »

Ray is quite right, plus the %cpu value does not take multi-cpu systems into account. I had a job yesterday loading 1million rows per minute into Oracle showing a very high %cpu value (sampling interval in PX of 5million rows) but since the system has 10 physical processors the real load on cpu was minimal while the I/O was used to the maximum.
Post Reply