Hi,
When we installed DataStage we put it on the C:\ drive. We have run out of space, but have plenty on the D:\ drive. How can I move all the info (logs, templates, project info, etc.) to the D:\ drive without screwing up any of the current jobs and make sure any new jobs are pushed to the D:\ drive?
Thanks in advance.
Steve
out of space on server
Moderators: chulett, rschirm, roy
out of space on server
SWKYDERBY
-
- Participant
- Posts: 3337
- Joined: Mon Jan 17, 2005 4:49 am
- Location: United Kingdom
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Make sure there are no DataStage processes.
Take an export of each entire project.
Take a backup of C: drive.
Delete the projects from C: drive using Administrator client.
Create projects with the same names on D: drive using Administrator client.
Connect to each project with Manager and Import from export file. (Note that you can "Open Project" in Manager; you don't have to disconnect and re-connect.)
In case of failure, use backup to reinstate on C: drive and get back to us.
Take an export of each entire project.
Take a backup of C: drive.
Delete the projects from C: drive using Administrator client.
Create projects with the same names on D: drive using Administrator client.
Connect to each project with Manager and Import from export file. (Note that you can "Open Project" in Manager; you don't have to disconnect and re-connect.)
In case of failure, use backup to reinstate on C: drive and get back to us.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.