Hi all,
i have a job getting data from AS400/db2 to Oracle.. when i run the job myself data goes perfectly. but when i schedule the job even after 5 minutes it give me error of "call to SQLConnect failed" ... the connect to the db2 is through ODBC and i tried it to be without SQL prompting or with but still the same (works fine when i run it and fails when run by schedule).
is there a setting i should make for the scheduled jobs ... why this happens?
thanks in advance..
Fahad
scheduled job with connect error
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 3337
- Joined: Mon Jan 17, 2005 4:49 am
- Location: United Kingdom