Hi all,
I have a main sequence that has sequence in each job activity.My requirement is --
If a job aborts in a sequence, then i should not run the jobs following this job in that sequence and also other sequences next to this sequence.
I am using utility abort to log routine to avoid running jobs next to aborted job with in a sequence.But when it comes to next sequence I am unable to do this because even if the jobs in a sequence abort, message in the log says job under control finished.
How can i meet this requirement?
Any help is appreciated
Thank You
problem with nested sequences
Moderators: chulett, rschirm, roy
-
- Charter Member
- Posts: 143
- Joined: Thu Nov 04, 2004 6:53 am
-
- Charter Member
- Posts: 35
- Joined: Sun Jan 16, 2005 8:39 am
- Location: US
Re: problem with nested sequences
hi,
Try addind a stage called Global Exception handler and link to a abort stage. something like this
GolbalExceptionHandler----------->abortStage.
so any erraneous job the control will go to
GolbalExceptionHandler and then u have a option to either continue or abort.
hope this helps you..
santosh
assistant consultant
mumbai
Try addind a stage called Global Exception handler and link to a abort stage. something like this
GolbalExceptionHandler----------->abortStage.
so any erraneous job the control will go to
GolbalExceptionHandler and then u have a option to either continue or abort.
hope this helps you..
santosh
assistant consultant
mumbai
vcannadevula wrote:Hi all,
I have a main sequence that has sequence in each job activity.My requirement is --
If a job aborts in a sequence, then i should not run the jobs following this job in that sequence and also other sequences next to this sequence.
I am using utility abort to log routine to avoid running jobs next to aborted job with in a sequence.But when it comes to next sequence I am unable to do this because even if the jobs in a sequence abort, message in the log says job under control finished.
How can i meet this requirement?
Any help is appreciated
Thank You
Santosh