Operato terminated abnormally: received signal SIGSEGV

Infosphere's Quality Product

Moderators: chulett, rschirm

Post Reply
n.parameswara.reddy@accen
Participant
Posts: 40
Joined: Mon May 18, 2009 5:22 am

Operato terminated abnormally: received signal SIGSEGV

Post by n.parameswara.reddy@accen »

i have installed new server for quality stage, while running QS job its giving below SIGSEGV error

STANDARDIZE,0: perator terminated abnormally: received signal SIGSEGV terminated abnormally: received signal SIGSEGV
STANDARDIZE,1: Operator terminated abnormally: received signal SIGSEGV
STANDARDIZE,2: Operator terminated abnormally: received signal SIGSEGV
STANDARDIZE,3: Operator terminated abnormally: received signal SIGSEGV

Please help me regarding this operator issue.

Thanks in advance
Param
ray.wurlod
Participant
Posts: 54607
Joined: Wed Oct 23, 2002 10:52 pm
Location: Sydney, Australia
Contact:

Post by ray.wurlod »

A search for SIGSEGV got 159 hits. Does none of them help?
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
n.parameswara.reddy@accen
Participant
Posts: 40
Joined: Mon May 18, 2009 5:22 am

Post by n.parameswara.reddy@accen »

ray.wurlod wrote:A search for SIGSEGV got 159 hits. Does none of them help? ...

No hits related to Quality stage
ray.wurlod
Participant
Posts: 54607
Joined: Wed Oct 23, 2002 10:52 pm
Location: Sydney, Australia
Contact:

Post by ray.wurlod »

SIGSEGV means that you've run out of (virtual) memory and/or attempted to access a memory address to which you're not entitled. I suspect that, in your case, the most likely suspect is the first scenario. The solution is to add more memory if you want to standardize this volume of data.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Post Reply