Hi All,
I would like to do
Standardization -> Frequency ->Match specification -> undup
like a sequential job..
Is there any way in qualitystage to do that?
Automation of Qualitystage job from standardization to undup
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Hai Ray,
Thanks for your response .
Could you please let me know the link ?
It would be really nice if you give me the link ASAP...
Thanks in advance
Thanks for your response .
Could you please let me know the link ?
It would be really nice if you give me the link ASAP...
Thanks in advance
ray.wurlod wrote:Yes. One of the pictures in the glossy literature from IBM shows just such a job (for version . It even goes on to do survivorship in the same job. ...
vairamuthu
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
I'd have to search for it, and I'm kinda busy at the moment. Why don't you try searching www.ibm.com?
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
-
- Participant
- Posts: 3593
- Joined: Thu Jan 23, 2003 5:25 pm
- Location: Australia, Melbourne
- Contact:
Don't search www.ibm.com - it's a terrible search engine. There is an extensive DRAFT redbook about QualityStage 8 that I talked about in this blog post. There is also a QualityStage tutorial on your install disk though I don't know if it has the example you are looking for.
Certus Solutions
Blog: Tooling Around in the InfoSphere
Twitter: @vmcburney
LinkedIn:Vincent McBurney LinkedIn
Blog: Tooling Around in the InfoSphere
Twitter: @vmcburney
LinkedIn:Vincent McBurney LinkedIn
Sequence job
Hi vcmburney,
Thanks for your reply. I already gone through that redbook. It dint have example of it.
i had a sample sequence job. But in that sample after standardization and frequency the next sequence job is undup .They dint include match specification in that sequence job. they include match specification in undup job .
i have to double check that sequence job .i will try and post that results soon
Thanks for your reply. I already gone through that redbook. It dint have example of it.
i had a sample sequence job. But in that sample after standardization and frequency the next sequence job is undup .They dint include match specification in that sequence job. they include match specification in undup job .
i have to double check that sequence job .i will try and post that results soon
vmcburney wrote:Don't search www.ibm.com - it's a terrible search engine. There is an extensive DRAFT redbook about QualityStage 8 that I talked about in this blog post. There is also a QualityStage tutorial on your install disk though I don't know if it has the example you are looking for.
vairamuthu