Search found 3 matches
- Wed Dec 13, 2006 5:47 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Clear Log of Multiple Instance jobs
- Replies: 8
- Views: 2933
Clear Log of Multiple Instance jobs
Hi to all, I have two multiple instance jobs that are executed daily 300 times each. That means that 600 hundrends instances are created daily in the director making it very difficult to trace it. Is it possible to delete these automatically without loosing the log records that is under the main job...
- Wed Oct 18, 2006 12:46 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Read Binary (BCD) file with variable length records
- Replies: 4
- Views: 4730
Hi, thanks for your answer. I have the description of the file format. The file structure is like that: In the beginning of the row there are some fixed length fileds that are standard in every record and after that there is a field with the total length of the record annd then there are some variab...
- Tue Oct 17, 2006 7:02 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Read Binary (BCD) file with variable length records
- Replies: 4
- Views: 4730
Read Binary (BCD) file with variable length records
Hi to all, I am a new comer in the forum and I need your help for the following issue(s). The task that we must do using Datastage is to read a binary file (CDRs) that is in BCD format and translate it in ascii format. For this i want someone to describe me which is the best practise for doing so us...