Search found 123 matches
- Tue Aug 19, 2008 2:22 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Not able to see jobs in DS 7.5.2 Director as a"DS Opera
- Replies: 7
- Views: 2715
- Tue Aug 19, 2008 2:17 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Not able to see jobs in DS 7.5.2 Director as a"DS Opera
- Replies: 7
- Views: 2715
Not able to see jobs in DS 7.5.2 Director as a"DS Opera
Not able to see the jobs (both server & parallel jobs) in DataStage EE 7.5.2 Director as a "DataStage Operator" (Role).
- Wed Aug 13, 2008 9:49 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: DS EE Server time is different than the OS time
- Replies: 2
- Views: 1246
- Wed Aug 13, 2008 8:31 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: DS EE Server time is different than the OS time
- Replies: 2
- Views: 1246
DS EE Server time is different than the OS time
We have both DS 7.5 and DS 8.0.1 on the same Unix(AIX) box. DS 7.5 Server time is in sync with OS time but DS 8.0.1 Server time is 5 Hours ahead of OS time.
Is there any clue on it.
Thanks
Is there any clue on it.
Thanks
- Tue Aug 05, 2008 9:53 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Unable to extend sys.dba_extents Oracle Enterprise
- Replies: 11
- Views: 5029
- Fri Aug 01, 2008 3:24 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: DS performance isssues with Designer.
- Replies: 2
- Views: 892
- Thu Jul 31, 2008 10:29 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Login and continue working with DS8.0.1, if Node-agents down
- Replies: 5
- Views: 1781
We intentionally brought-down the ASB Node Agent(s) (for test). Tried login/continue working with DS8.0.1 Designer/Director. We have successfully logged-in and continued working with DS8.0.1 Designer/Director save/compile/run jobs, with ASB Node Agent down. We are wondering that how is this possible.
- Wed Jul 30, 2008 2:11 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Login and continue working with DS8.0.1, if Node-agents down
- Replies: 5
- Views: 1781
- Wed Jul 30, 2008 1:18 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Login and continue working with DS8.0.1, if Node-agents down
- Replies: 5
- Views: 1781
Login and continue working with DS8.0.1, if Node-agents down
Can we login and continue working (save/compile/Run) with DataStage 8.0.1 Designer/Director, when ASBNode agent(s) is down. If yes or no why?
Regards
VS
Regards
VS
- Tue Jul 29, 2008 10:08 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: How to unlock datastage jobs.
- Replies: 8
- Views: 47935
If you are not able to see that lock from DS Director, go to DS Administrator, select the project, click on command button, issue command LIST.READU ALL, look for the user and inode for that particular locked process, issue command UNLOCK USER <user number> ALL , or UNLOCK <inode number> ALL. But, y...
- Tue Jul 29, 2008 10:07 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: How to unlock datastage jobs.
- Replies: 8
- Views: 47935
If you are not able to see that lock from DS Director, go to DS Administrator, select the project, click on command button, issue command LIST.READU ALL, look for the user and inode for that particular locked process, issue command UNLOCK USER <user number> ALL , or UNLOCK <inode number> ALL. But, y...
- Tue Jul 29, 2008 9:48 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Jobs running very longtime
- Replies: 11
- Views: 5046
- Tue Jul 29, 2008 9:38 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Not able find the Websphere Session ID
- Replies: 5
- Views: 1999
- Thu Jul 24, 2008 1:04 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: DS Repository Interface Error-Connection has timed out(81015
- Replies: 4
- Views: 4761
- Thu Jul 24, 2008 10:17 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: DS Repository Interface Error-Connection has timed out(81015
- Replies: 4
- Views: 4761
DS Repository Interface Error-Connection has timed out(81015
we are having a repeated problem: Some users(and admin) are not able to login to DataStage 8.0, but existing/established users/connections are working fine. If anybody tried to login to DS8.0, its throwing following error, DataStage Repository Interface Failed to connect to DataStage Server: <server...