Search found 157 matches
- Wed Nov 19, 2008 8:05 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Size limit in DataStage?
- Replies: 3
- Views: 1612
- Wed Nov 19, 2008 12:37 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Size limit in DataStage?
- Replies: 3
- Views: 1612
Size limit in DataStage?
Hi Is there any size limit in Datastage to load data? Earlier in some 7.5 version, we faced a problem of 2GB size limit above which datastage couldnt load. But recently we have 7.5.2 and we are able to load 2.7GB size data. Can you please let us know is this size limit is no where present? Thanks Sai
- Fri Nov 07, 2008 2:27 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: NLS mapping problem
- Replies: 12
- Views: 7250
NLS mapping problem
Hi We recently changed NLS mapping from ISO8859-1 to UTF8. We were done this to have all the international characters as specified in UTF8 to show in the table correctly. Because of this change, the following job behaving differently SEQ FILE -> TFM -> TABLE Earlier All the records were loading to t...
- Tue Oct 14, 2008 6:40 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Applying UTF-8 to all jobs of project
- Replies: 6
- Views: 1705
- Tue Oct 14, 2008 5:21 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Applying UTF-8 to all jobs of project
- Replies: 6
- Views: 1705
- Tue Oct 14, 2008 3:08 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Applying UTF-8 to all jobs of project
- Replies: 6
- Views: 1705
- Tue Oct 14, 2008 1:17 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Applying UTF-8 to all jobs of project
- Replies: 6
- Views: 1705
Applying UTF-8 to all jobs of project
Hi We are changing our Character set to UTF-8 in our Oracle database. We are doing this to load some special characters to our changed database. To change in ETL front, we have hundreds of jobs which does loading. All are assigned to Project default. The project default in administrator is "ISO...
- Wed Sep 17, 2008 7:03 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Hash File creation taking long time
- Replies: 1
- Views: 999
Hash File creation taking long time
Hi I have the following job DB Stage-> Tfm ->Aggregator ->Hash File From DB Stage, we are extracting 3 million records and doing aggregation which is converting into 2.3 million records and then loading to hash file. This job is taking around 55 minutes to load. If I replace hash file with sequentia...
- Mon Sep 15, 2008 8:48 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Parallel calling of Job with different invocation ids
- Replies: 3
- Views: 1625
- Mon Sep 15, 2008 5:26 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Parallel calling of Job with different invocation ids
- Replies: 3
- Views: 1625
Parallel calling of Job with different invocation ids
Hi
How do we call paralelly for several times (say 100 times), a job with different invocation ids?
As our underlined job, is loading huge volume of data in each instance.
Thanks
Sai
How do we call paralelly for several times (say 100 times), a job with different invocation ids?
As our underlined job, is loading huge volume of data in each instance.
Thanks
Sai
- Fri Sep 12, 2008 4:52 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Parallel loading with SQL loader Direct path
- Replies: 2
- Views: 2524
Parallel loading with SQL loader Direct path
Hi We were having multiple huge sized input files, that needs to be loaded to a single table. We designed a job, which gets data from a file and load it to table. SEQFILE -> TFM -> Oracle SQL Loader Stage We enabled multiple instance to this job. Currently we would like to run multiple instances of ...
- Wed Sep 10, 2008 6:09 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Migration to different host became speed 10 times lower
- Replies: 9
- Views: 4534
- Wed Sep 10, 2008 2:39 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Migration to different host became speed 10 times lower
- Replies: 9
- Views: 4534
- Wed Sep 10, 2008 12:50 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Migration to different host became speed 10 times lower
- Replies: 9
- Views: 4534
- Wed Sep 10, 2008 12:39 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Migration to different host became speed 10 times lower
- Replies: 9
- Views: 4534
A system's top command output as follows top - 23:34:59 up 54 days, 4:29, 2 users, load average: 0.00, 0.00, 0.00 Tasks: 123 total, 1 running, 122 sleeping, 0 stopped, 0 zombie Cpu(s): 0.0% us, 0.0% sy, 0.0% ni, 99.9% id, 0.0% wa, 0.0% hi, 0.1% si Mem: 8166112k total, 8137588k used, 28524k free, 50...