Search found 4 matches
- Fri Feb 25, 2005 10:09 am
- Forum: Information Analyzer (formerly ProfileStage)
- Topic: Connecting from PS Client/server to PSDB repository
- Replies: 3
- Views: 4784
Re: Connecting from PS Client/server to PSDB repository
Make sure that the MSGSwitch up and run.And make sure there's only one MSGSwitch installed (on ur server), can only hv 1 msgswitch in ur c/s environment. Then: 1.make sure u can connect to a SQL based repository. this wl make sure that ur client is good. 2. Using the ascential DB2 drv to create the ...
- Tue Feb 22, 2005 9:06 am
- Forum: Information Analyzer (formerly ProfileStage)
- Topic: Error importing meta data
- Replies: 8
- Views: 8294
Re: Error importing meta data
if u guys want to load meta data from the .txt file, What shld to do is 1:create odbc conenction with ascential odbc .txt drv, during the creation, in "general tab", u shld give the name of source data and directory/folder of the souce data files u put in ur pc; in "advanced tab"...
- Wed Feb 16, 2005 9:08 am
- Forum: Information Analyzer (formerly ProfileStage)
- Topic: question about "MrdbDistrbutionLimit" of profilest
- Replies: 0
- Views: 3327
question about "MrdbDistrbutionLimit" of profilest
i am using p.f analyze one porject's data for profiling. one column contains 69,781 unique values(distribution domainvalue shld also be 69,781?), while after column analysis, all the related reports keep saying only 32,000 distribution/unique/disntinct/cardinality values found for this column though...
- Wed Feb 16, 2005 8:57 am
- Forum: Information Analyzer (formerly ProfileStage)
- Topic: Profile Stage performance
- Replies: 5
- Views: 6480
one trick is to use 4 cpu work for u
i noticed that u got 4 cpu server. One trick probably can help to fasten the column analysis: f.inst: u hv 4 tables to analyze, u can create 4 jobs,each contains only one table on the analysis-server, profilestage wl use the 4 cpu do 4 analysis simulatanously, which wl much shrtern the time. hope th...