Search found 17 matches
- Tue Aug 18, 2009 7:37 am
- Forum: Information Analyzer (formerly ProfileStage)
- Topic: Information Analyzer 8.1.1 and datastage 8.1
- Replies: 8
- Views: 10376
Information Analyzer 8.1.1 and datastage 8.1
Hi i am newto Information Analyzer, but experienced with datastage, and is trying to get a grip on the IBM Information Analyzer and has an installtion running of version 8.1.1 It is working fine and i have performed several analysis on a set of tables. Very nice i think, but i must have missed somet...
- Wed Oct 08, 2008 12:21 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: job scheduling info lost when rescheduling other jobs
- Replies: 1
- Views: 762
job scheduling info lost when rescheduling other jobs
Hi I have a strange problem with version 8, windows environment. i have a lot of sequences set to start at various timings of the day. yesterday i rescheduled some off them, and this morning OTHER sequences had lost their schedule. I have seen this once or twice before, but thought it was my mistake...