Search found 167 matches

by reddy
Wed Apr 25, 2012 9:07 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Handling the special characters
Replies: 5
Views: 3515

its not frustration its just the urgency.....
by reddy
Wed Apr 25, 2012 8:28 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Handling the special characters
Replies: 5
Views: 3515

GUys, appreciate your quick help, can you plz respond?
by reddy
Tue Mar 01, 2011 1:16 pm
Forum: General
Topic: Error calling DSSetParam
Replies: 13
Views: 19201

is there any way other than refreshing the job activity? since i have hardcoded so many values

Could you plz let me know.
by reddy
Thu Oct 21, 2010 8:31 am
Forum: General
Topic: Read-Only access to Director
Replies: 3
Views: 2227

chulett wrote:So... you are looking for a way to... view job logs? Check job status? What are you after with this access?
Yes. To check if the job has run, it's status, and contents of log. Basically to see the log to troubleshoot the error instead of reaching out to an operator
by reddy
Thu Oct 21, 2010 6:23 am
Forum: General
Topic: Read-Only access to Director
Replies: 3
Views: 2227

Read-Only access to Director

Hi, I'm trying to setup read-only datastage account and the lowest role i have is operator which allow to run a job. By assigning the operator role, i could limit the user from editing a job. Cool with that. Are there ways to restrict the access to run a etl job in director? Does information server ...
by reddy
Tue Oct 13, 2009 10:33 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How to read Project environment variable in a Routine
Replies: 4
Views: 3169

That works, thanks for the help
by reddy
Tue Oct 13, 2009 9:38 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How to read Project environment variable in a Routine
Replies: 4
Views: 3169

How to read Project environment variable in a Routine

Hi guys,

I have a requirement to retrieve the value of a project parameter in a before/after routine.

I tried DSListEnvVars("PROJECT NAME"), but gives compilation error.

Any help is appreciated.
by reddy
Thu Oct 01, 2009 1:24 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Sybase,0: U_TRUNCATED_CHAR_FOUND encountered.
Replies: 0
Views: 1402

Sybase,0: U_TRUNCATED_CHAR_FOUND encountered.

Hi Guys, I am using sybases as my source database, everything looks fine untill i get the following error: Sybase,0: U_TRUNCATED_CHAR_FOUND encountered. We have character values and i do not know how to trin them as trim does not function in sybase. This is a fatal error so that is the reason iam to...
by reddy
Thu Sep 10, 2009 1:40 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Substract ! month from date
Replies: 1
Views: 1655

Substract ! month from date

Hi Guyz,

Hope you are doing fine!!!

i got a quick question:

can someone please let me know how to Substract 1 month from date column in SQL on db2 Database?


Thanks in Advance!!!
by reddy
Wed Sep 09, 2009 11:48 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Problem with StringtoDate function
Replies: 3
Views: 4684

Thanks Arndw ....That fixed my problem
by reddy
Wed Sep 09, 2009 11:18 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Problem with StringtoDate function
Replies: 3
Views: 4684

Problem with StringtoDate function

Hi All, In my job i am using the transformer stage where I have used stage variables to implement logic. In that I have used StringToDate function to give the default date value for a date field . But the job is failing with following error. APT_CombinedOperatorController,0: Operator terminated abno...
by reddy
Thu Sep 03, 2009 11:33 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Unique requirement to combine two files
Replies: 9
Views: 4105

Unique requirement to combine two files

Hi, I have a requirement to combine records from two input files, none of which is a Master. I want records from both merged, but on the same line. Input file 1 53,red 53,blue 55,black 57,orange 57,violet Input file 2 53,boy 53,cat 53,dog 54,pig 55,rat 56,girl Expected Output is 53, red, boy 53, blu...
by reddy
Tue Mar 10, 2009 1:07 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: PID Failed
Replies: 18
Views: 11695

Guyz,


I also have the same problem but i think that it may be the CPU which is causing all the problem. If the CPU speed of the server is slow than we will be getting this error.

That was just an idea. Correct me if iam wrong.
by reddy
Thu Oct 16, 2008 3:03 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Number conversion
Replies: 18
Views: 7224

Yes you are right, the loading of data does not depend on us. I changed the datatype to char and this time it worked.

Thank you for your patience,time and effort.
by reddy
Thu Oct 16, 2008 2:36 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Number conversion
Replies: 18
Views: 7224

thankx craig, The data did load perfectly but i want the data to be in te following format I want the data to be converted into the following format: Target 3001.23 200.20 2345.00 2323.00 1876.12 where as the data which is loaded does not have zeros and also that i need 2 digits compulsorily after t...