Search found 16 matches

by sreeni
Fri Jul 11, 2008 10:00 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: run time error '6':overflow
Replies: 1
Views: 2338

run time error '6':overflow

Hi, We are using datastage 7.5.1 server Jobs edition in my project. Today we are getting the below error when we tried to connect datastage director. run time error '6':overflow We were able to connect datastage director properly till yesterday. Can any body help us how to solve this error? Thanks
by sreeni
Fri May 23, 2008 10:26 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Passing parameters to a nested loop
Replies: 6
Views: 3470

Hi

Thanks for valueble information. It is working fine for parallel jobs.
Is it possible in server jobs?

Thanks
Sreeni
by sreeni
Fri May 23, 2008 4:22 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Passing parameters to a nested loop
Replies: 6
Views: 3470

Re: Passing parameters to a nested loop

Ray, I have two files with same structure, File names are test1.txt, test2.txt test1.txt file structure is ID Integer Desc Varchar(100) test2.txt file structure is ID Integer Desc Varchar(100) Can I read these two files data in one sequetial file stage? Could you please give us more explanation with...
by sreeni
Fri Mar 14, 2008 6:27 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Datstage IP Address Change
Replies: 3
Views: 3028

Thanks, we changed the IP Adress of datastage server is working fine
by sreeni
Tue Mar 11, 2008 4:57 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Datstage IP Address Change
Replies: 3
Views: 3028

Datstage IP Address Change

Hi, we have Datastage server edition 7.5.1 installed on Sun solaris system(sample IP Address: 10.01.01.01) and we are using same system from two years. As per the requirement, we are planning to change the IP Address to 20.01.01.01. After changed IP Adress, Is there any effect to Datastage? Please s...
by sreeni
Mon Dec 17, 2007 8:09 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: job locked, clean up resources not working
Replies: 12
Views: 7073

Restart the datastage server and try to open your Jobs.
by sreeni
Thu Dec 13, 2007 6:37 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Job running status
Replies: 1
Views: 1395

Job running status

We can see the Job is running or not in Datastage Director.

Is there any other way to find out whether Job is running or not by using Administrator command query?
by sreeni
Thu Dec 13, 2007 6:02 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: OCI has fetched truncated data
Replies: 10
Views: 5171

I executed the query in prod and pre-prod datastage. It retruns same date format. So I need to dig into the prod and pre-prod databases.
by sreeni
Wed Dec 12, 2007 9:55 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: OCI has fetched truncated data
Replies: 10
Views: 5171

I got the below entry.

LOC0020 D

Can I know the meaning of the above entry?
by sreeni
Tue Dec 11, 2007 6:35 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: OCI has fetched truncated data
Replies: 10
Views: 5171

Thanks for spending your valueble time, I tried to get the more information regarding date default settings in msg.txt file. I couldn't get any info. I am able to see some sample below entries in msg.txt file. DLM0040 Process sig (%d) has date of %ld\n GNS0002 genser: cannot decode date\n UVR0018 to...
by sreeni
Tue Dec 11, 2007 12:20 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: How can I genarate multiple rows from a single row
Replies: 5
Views: 2944

Try to use Job activity stage to call your job in Start loop and End loop activity stages in the Job sequencer. Use Start value = 1 , End Value =4.
Then same input record gets inserted into output stage four times.
by sreeni
Tue Dec 11, 2007 12:18 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: How can I genarate multiple rows from a single row
Replies: 5
Views: 2944

Try to use Job activity stage to call your job in Start loop and End loop activity stages in the Job sequencer. Use Start value = 1 , End Value =4.
Then same input record gets inserted into output stage four times.
by sreeni
Tue Dec 11, 2007 12:04 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: OCI has fetched truncated data
Replies: 10
Views: 5171

Thanks for the clarification.

I can see the NLS tab is disabled in datastage administrator.
where can I see the default date format settings in datastage server?
by sreeni
Mon Dec 10, 2007 4:14 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: OCI has fetched truncated data
Replies: 10
Views: 5171

Sorry, I changed column datatype from Char(10) to Date(10).
do I need to verify any datastage specific properties?
by sreeni
Mon Dec 10, 2007 12:54 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: OCI has fetched truncated data
Replies: 10
Views: 5171

OCI has fetched truncated data

Hi, I know it has been posted in the past. These posts helped me to solve my problem. we are using Oracle database as a source, one column data type in Oracle table is "date". when we are trying to retrieve data from this date column by using OCI stage, it is giving error "OCI has fet...