Search found 91 matches

by kab123
Mon Feb 07, 2005 9:50 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Compare
Replies: 6
Views: 1462

Compare

Hi All,

How can we just compare two files...and find the differences...
No Inserts and Updates needed...
Any Clue..?

Thanks
by kab123
Fri Jan 28, 2005 11:55 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: csv File
Replies: 10
Views: 4104

No, I cant even view..
The error I sent you is when i clicked on "View data"..If I run it ..It failed...
by kab123
Fri Jan 28, 2005 11:43 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: csv File
Replies: 10
Views: 4104

The error says as follows, it cant open file:

DSD.SEQOpen Failed to open CORAM.TXT in directory so and so
STATUS = 2.
I have specified (,) as delimiter and quote charac as (0)...

Thanks
by kab123
Fri Jan 28, 2005 10:58 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: csv File
Replies: 10
Views: 4104

csv File

Hi,

Can I save an excel file as a csv file and use it from Sequential file..? I tried to do so..but the job failed... Pls tell me if there is any way that i can save this file as a Sequential file stage readable..?

Thanks
by kab123
Thu Jan 27, 2005 10:47 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer
Replies: 6
Views: 2489

Hi Sai,

So Irrespective of wat parameters we gave in sub jobs, It will over write from Job Sequencer Parameters list...rt..?

Thanks..
by kab123
Thu Jan 27, 2005 9:53 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer
Replies: 6
Views: 2489

Sequencer

Hi,

Do the Parameters in Job Sequencer Overwrite the parameters in each job..? or Do I need to give the same parameters in all jobs and sequencer...? I used Job Control, I never Used Sequencer..I think it will overwrite but Pls correct me if I am wrong...

Thanks in Advance..
by kab123
Wed Jan 26, 2005 3:32 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Multiple Instances
Replies: 3
Views: 781

Multiple Instances

Hi,

May I know in what context we can use Multiple Instances..?

I have a job to look for which is running in Multiple Instances...what we need to specify while running it...at Invocation ID..?

Thanks in Advance...
by kab123
Thu Jan 06, 2005 3:50 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Joins in Server Job
Replies: 4
Views: 1935

Perfect ....

Thank you ver much Ray... :D
by kab123
Thu Jan 06, 2005 3:09 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Joins in Server Job
Replies: 4
Views: 1935

As you said we can use a database stage or a hashfile stage, how can we specify what kind of join we need...if i give the condition in constraint box in transformer like lnk1.ColA=lnk2.ColA, it will become innerjoin...how about Outer Joins...

Thanks Ray !!! :D
by kab123
Thu Jan 06, 2005 12:31 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Joins in Server Job
Replies: 4
Views: 1935

Joins in Server Job

Hi ,

I am a guy of Parallel extender...We are asked to do a server job...I am little bit concerned about doing joins (like Inner Join, left Outer...etc.,) how can we specify the type of joins in server job...?
Can anyone pls hint me..?

Thanks
by kab123
Wed Jul 21, 2004 8:49 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: DS Repository Interface error
Replies: 4
Views: 1648

DS Repository Interface error

Hello everybody, can anybody tell me what this error message mean? " Error Calling Subroutine:*DataStage*DSR_SELECT (Action=3): check DataStage is setup correctly in project XXX (The connection is broken (81002)) Is this something that popsup if we dont use datastage for sometime or something r...
by kab123
Thu Jul 08, 2004 12:49 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: difference between Datastage's release 6x and 7x
Replies: 6
Views: 2792

Hi Lory, I am giving what I new, I welcome someone with more information on this. 1) In 7x, we have some new stages added like row merger and row splitter etc.. 2) we can copy and paste the stages, jobs in the designer. 3) you can run job in the designer itself. 4) we can compile multiple jobs at a ...
by kab123
Fri Jun 18, 2004 7:47 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Difference between Transformer and Basic Transfomer stage ?
Replies: 7
Views: 6776

The basic difference between these two is that in BASIC Transformer stage, we can access BASIC transforms, routines and functions as the name itself says.
and the documentation "Parallel Job developer guide" gives you two chapters with clr description.hope that will help you.

Thanks
by kab123
Fri Jun 11, 2004 7:34 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Problem Concatenation
Replies: 9
Views: 2783

In The Target Seq file, in the inputs tab, default is set to 'over write existing file',you have to select for second seq file as append existing file.
I think this will do.
by kab123
Tue May 18, 2004 4:45 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Current Timestamp
Replies: 2
Views: 2724

Thanks Ray

Abhi