Search found 89 matches

by arunverma
Wed Jun 09, 2004 1:30 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Controller problem
Replies: 22
Views: 11544

Hi amitdurve ,

We can change job name this is running application , if we change chaild job , we have to change a lot of place , but probelm is why it not triggred ,
is any other solution .


Arun
by arunverma
Wed Jun 09, 2004 12:33 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Controller problem
Replies: 22
Views: 11544

NO ,

This job is in production , nobody can open , we test all child job and Individually , working fine . reset option seted


arun
by arunverma
Wed Jun 09, 2004 12:11 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Controller problem
Replies: 22
Views: 11544

Yest all job is in reset mode , it is working for last six month , we faced this problem yesterday onle .

arun
by arunverma
Wed Jun 09, 2004 12:10 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Controller problem
Replies: 22
Views: 11544

amitdurve wrote:Check if the job being called is in runable state ("compiled"/"finished"/"has been reset").
Try running the sequence job after recompiling the jobs being controlled(the child jobs).
Job is in runable state , this is working for last six month.

arun
by arunverma
Tue Jun 08, 2004 11:39 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Controller problem
Replies: 22
Views: 11544

Controller problem

can any body help with following error , In our application , We have created extraction job sequencer and this sequencer call 5 Data extraction job parallely , but job sequencer could not triggered all extarction and give following error J0BlaSrc..JobControl (@J3BlaSrc): Controller problem: Error c...
by arunverma
Tue Jun 08, 2004 11:28 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Synchronization error Resource
Replies: 2
Views: 1825

Synchronization error Resource

We are facing Synchronization error in our running application , in this application we are extracting data from source system and load in our database , extraction and loading is multiinstance job . due to this error it not triggered other job . Error Log :- J8IcaSrc.61.T1: Synchronization error Re...
by arunverma
Wed May 19, 2004 3:17 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Backup HashFile
Replies: 4
Views: 2004

Re: Backup HashFile

Hi ,

While creating hash file , you can also give path , where you want to store ( Application working Directory ) then you can take backup , If you are not chhosing path then hash file create default directory on ETL server .

Arun
by arunverma
Wed May 19, 2004 3:11 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Difference Between Tow Date
Replies: 4
Views: 1732

Thanks ,

I applied this logic , Now my job is working fine .


arun
by arunverma
Tue May 18, 2004 6:02 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Difference Between Tow Date
Replies: 4
Views: 1732

Difference Between Tow Date

Can any body help me in DataStage Designer , How to get number of days between to date , currently I am using routine DateGenericDateDiff, and here we have to give input date like 20040518 (yyyymmdd) , toget this format we have to first conver date into string format then substr for year, month and ...
by arunverma
Thu Apr 29, 2004 6:01 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Job Parameter Problem
Replies: 7
Views: 2372

Yes our friend Mr. Anupam has also raised this problem , Once any job aborted we reset then restart again , but still parameter is not passing to child job , We have not raised this problem to SAP India .
by arunverma
Wed Apr 28, 2004 7:28 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Job Parameter Problem
Replies: 7
Views: 2372

Yes I Agree with your view , But I found some time it work and some time it is not ?? , We also face problem that if any value passed through root job sequencer then some child job got correct valy and some one got with different value , then we restart DataStage server and all application working f...
by arunverma
Wed Apr 28, 2004 5:44 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Job Parameter Problem
Replies: 7
Views: 2372

We have set this default parameter through Datastage Director , but some time working , some time not ??
by arunverma
Wed Apr 28, 2004 4:18 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Job Parameter Problem
Replies: 7
Views: 2372

Welcome to the Forum. :D Your job is either a multi-instance server job, or it is a parallel job. Parallel jobs do not have, or need, multi-instance capability, because parallelism is built in to the architecture, based on the configuration file. Since you did not mention a configuration file, I wi...
by arunverma
Wed Apr 28, 2004 3:39 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Job Parameter Problem
Replies: 7
Views: 2372

Job Parameter Problem

We have develeoped module which extract data from multiple server and load into DW server , This is a Multinstance job , When I set defaut for server no 1 Ex: SVRNO = 1 (Multii Instance -1 ) and then set parameter for server 2 , SVRNO = 2 (Multii Instance -2 ) , server 3 , SVRNO = 3 (Multii Instance...