Search found 11 matches
- Thu Oct 24, 2013 2:55 am
- Forum: General
- Topic: Pre-Requisite for configuring Netezza Connectivity
- Replies: 1
- Views: 1189
Pre-Requisite for configuring Netezza Connectivity
Hello Folks/Experts, We are having a requirement to connect to a Netezza DB in our parallel jobs to pull data from tables. Can someone assist in providing steps to follow for doing the necessary configurations at server level before we can use the netezza connector stage to pull data. Also is there ...
- Thu Feb 07, 2013 11:31 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Warnings due to RCP
- Replies: 0
- Views: 1102
Warnings due to RCP
Hi All , I am using RCP in my job and because of which i am getting lot of warnings. Job design is as below. OracleStage----->CheckSum--->Filter-------->CheckSum1 OR CheckSum2--->Funnel---->DestOracleStage I am getting warnings only for the DestOracleStage. Warnings are Schema field FLD_15 in input ...
- Tue Feb 08, 2011 1:57 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: How many jobs we can execute in parallel?
- Replies: 4
- Views: 3437
- Mon Feb 07, 2011 12:19 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: How many jobs we can execute in parallel?
- Replies: 4
- Views: 3437
How many jobs we can execute in parallel?
Hi All,
I would like to know if there is any limit in Datastage as to execute the number of jobs is parallel?
(In Specific- Can we execute 10 jobs in parallel or is there a limit on number jobs?).
TIA
Sameer.
I would like to know if there is any limit in Datastage as to execute the number of jobs is parallel?
(In Specific- Can we execute 10 jobs in parallel or is there a limit on number jobs?).
TIA
Sameer.
- Wed Nov 24, 2010 9:21 pm
- Forum: General
- Topic: Size Difference between AIX executables and SUN executables
- Replies: 3
- Views: 2025
- Wed Nov 24, 2010 3:28 am
- Forum: General
- Topic: Size Difference between AIX executables and SUN executables
- Replies: 3
- Views: 2025
Size Difference between AIX executables and SUN executables
We have two machines as follows. AIX 6 and SunOS 5.10. When taken export of a same job with executables on these two machines, the size of the resulting files differs a lot. Ex: AIX Executable job has size 3MB where as SUN executable has 11MB. Are we missing any step or this difference is normal and...
- Thu Jun 10, 2010 10:05 pm
- Forum: General
- Topic: Login Issues with Datastage
- Replies: 6
- Views: 2708
- Thu Jun 10, 2010 7:02 am
- Forum: General
- Topic: Login Issues with Datastage
- Replies: 6
- Views: 2708
- Thu Jun 10, 2010 5:32 am
- Forum: General
- Topic: Login Issues with Datastage
- Replies: 6
- Views: 2708
Login Issues with Datastage
Hi All, I have a datastage running on HP-UNIX machine. It stopped working with error message "Unable to begin a transaction". Then i restarted WAS. Now i am not able to login to datastage, error message is "Could not connect to server XXXXX on port XXXX ". I am not even able to s...
- Tue May 25, 2010 9:24 am
- Forum: General
- Topic: Error in connecting to Oracle 10g
- Replies: 1
- Views: 1406
Error in connecting to Oracle 10g
I am not able to connect to oracle. I get following error when i run the job. Error loading "orchoracle": Could not load "orchoracle": dsenv entries are as follows ORACLE_HOME=/oracle/ora10gr2 export ORACLE_HOME LD_LIBRARY_PATH=$LD_LIBRARY_PATH:$ORACLE_HOME/lib:$ORACLE_HOME/lib32...
- Thu May 20, 2010 6:44 am
- Forum: General
- Topic: Job deletion and Logs associated with these.
- Replies: 2
- Views: 1542
Job deletion and Logs associated with these.
Hi All, I am new to Datastage, wanted to know some information regarding logs and job deletion. Scenario is , i have deleted the jobs now i want to know whether all the logs assiciated with these jobs will automatically be purged? If not then , how to remove logs from repository manually. Thanks in ...