Search found 44 matches

by dhwankim
Thu Jul 17, 2008 3:02 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: DB2 Upsert in too slower to Mulit Partitions
Replies: 1
Views: 1847

Re: DB2 Upsert in too slower to Mulit Partitions

I found out the problem. This is caused by DB2 Fix Pack 9.1.5 I downgraded DB2 9.1.5 to 9.1.4 It's solved it. Hi All This week, I have installed DataStage Enterprise Edition on MPP Environment. after that, I check functionality or performance of DataStage Server , Parallel Job. My Problem is that Wh...
by dhwankim
Thu Jul 10, 2008 7:34 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: DB2 Upsert in too slower to Mulit Partitions
Replies: 1
Views: 1847

DB2 Upsert in too slower to Mulit Partitions

Hi All This week, I have installed DataStage Enterprise Edition on MPP Environment. after that, I check functionality or performance of DataStage Server , Parallel Job. My Problem is that When I upsert data to single partition table. Row per Second is aroubd 20,000 records. but When I upsert data to...
by dhwankim
Wed Apr 23, 2008 7:41 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How long time to need to start with DB2 64 partitions
Replies: 6
Views: 3843

Suggested Machine and BCU Architecture

Hi Now IBM has suggested Db2 BCU Architecture with datastage EE. My role is a design of ETL Architecture with this platform. The Platform is below ============= It consists of 10 P570 Macnines. One of Machine is DB2 Admin BCU and another is ETL BCU (ETL Main Machine, ETL Main machine has 12 core (24...
by dhwankim
Wed Apr 23, 2008 6:10 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How long time to need to start with DB2 64 partitions
Replies: 6
Views: 3843

How long time to need to start with DB2 64 partitions

Hi All Now I am participating DW Project with DataStage PX and DB2 BCU Architecture. This system will Near Real Time DW with huge volumn data. So DBA draws 64 Partition Configuration on 8 SMP Machines. My Concern is how long time to need to start DS PX Job with DB2 Enterprise Stage. Does Any body ha...
by dhwankim
Thu May 11, 2006 3:40 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: DB2 Enterpirse Stage use /tmp directory to making temp file
Replies: 7
Views: 4049

Hello, I think that if you have not configured the DB2 Enterprise Options, the stage is using the /tmp directory by default for Local Message files and other DB2 load files. You can add the "Message File" options, available in the stage and use your own directory. I configured the DB2 ent...
by dhwankim
Thu May 11, 2006 1:15 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: DB2 Enterpirse Stage use /tmp directory to making temp file
Replies: 7
Views: 4049

kumar_s wrote:Datastage Adminstrator cleint --> Project --> Properties -- > Environment -- >General ---> TMPDIR
I changed This Parameter /tmp ==> /disk1/dstmp already But result is same.

PLS Help me.~~
by dhwankim
Thu May 11, 2006 12:21 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: DB2 Enterpirse Stage use /tmp directory to making temp file
Replies: 7
Views: 4049

DB2 Enterpirse Stage use /tmp directory to making temp file

Hi All, I Now use db2 enterpise stage for loading data with write method "load". then My Concern is that Each Job exhaused "/tmp" for making tempaory file, msg and error file also. My machine is allocated small size volume for /tmp. So I want to change direcotr /tmp to /disk01/tm...
by dhwankim
Thu Feb 09, 2006 8:14 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: DB2 UDB Enterprise Stage with "Load" Write Method
Replies: 0
Views: 1376

DB2 UDB Enterprise Stage with "Load" Write Method

Hi All, I want to use DB2 UDB Enterprise Stage with "Load" Write Method. but That job was aborted with a message. the message is below DB2_UDB_Enterprise_14: Error Idx = 1; DB2 Driver Embedded SQL message: ; sqlcode = -332; sqlstate = 57017 Failed to connect to the database but When I chan...
by dhwankim
Thu Jan 26, 2006 7:05 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: How to execute cognos transformer through DataStage ExecDOS
Replies: 3
Views: 3708

How to execute cognos transformer through DataStage ExecDOS

Hi All Now I have tried to execute Cognos Transformer Command throuth DataStage ExecDos Routine. the Command is below. "C:\Program Files\Cognos\cer2\bin\trnsfrmr.exe" -n -s "D:\OLAP\Model\hlc-m-01.pyi" When I ran this command using Windows Terminal Service. It's Okay. But When I ...
by dhwankim
Tue Jul 26, 2005 2:14 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Again TIMEOUT(-14) .
Replies: 2
Views: 1561

Again TIMEOUT(-14) .

I am using DataStage 7.5.1A on AIX 5.3. a problems is that some jobs have aborted on schedule. I checked log in Director. There are just one message. Job has aborted because of Timeout[-14]. Some one said to me the reason is that too many jobs to run concurrently. So I arranged schedule. so the Maxi...
by dhwankim
Tue Jul 05, 2005 1:54 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer Job is aborted in DS7.5.1
Replies: 13
Views: 7034

Unfortunately the only detection in DataStage is the timeout when a job fails to start within a hard-coded interval. That is we can't tune the timeout. And, as you noted, the job that can not start aborts. You probably could do something with UNIX, but there's nothing supplied "out of the box&...
by dhwankim
Mon Jul 04, 2005 6:36 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer Job is aborted in DS7.5.1
Replies: 13
Views: 7034

JdDSSJOBUpdate_T1_JC_JOB_PARAMETERS_Hf is just one of server job. the job processes reading sequence file and transfomrating and looking up some hashed file , and writing to sequence. It's plain job. I recognize now my problem with utilizing H/W Resource Usage. But I wonder how to protect job from a...
by dhwankim
Mon Jul 04, 2005 6:29 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer Job is aborted in DS7.5.1
Replies: 13
Views: 7034

You are right.
but I just want to control how to retain this process until getting H/W Resource.
the current issues is that ds jobs have aborted when resource lack.

Now Current System available resource is 2 ~ 0 when Sequencer jobs running.


Thank your hands in advance.
by dhwankim
Mon Jul 04, 2005 4:14 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer Job is aborted in DS7.5.1
Replies: 13
Views: 7034

Does the same server job timeout each time? I suspect that it does not; could you stagger your 30 concurrent calls by making some of them depend upon others finishing? Also, monitor your cpu usage while these are running, vmstat should be detailed enough. Each job is different one. and this machine...
by dhwankim
Mon Jul 04, 2005 3:31 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer Job is aborted in DS7.5.1
Replies: 13
Views: 7034

Do you run in multiple instance? No, I did not use multi instance. but this entry-point sequencer job runs 30 more server jobs concurrentyly. So I wonder datastage engine could not start some child jobs. I used Unix (with 16CPUs, 60G Memory) for datastage process. SO I wonder why datastage did not ...