Search found 86 matches
- Thu Sep 22, 2011 3:16 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: A null pointer was found where one shouldn't exist
- Replies: 1
- Views: 5364
Re: A null pointer was found where one shouldn't exist
There was a datatype mismatch,thats why i am getting that error.
- Wed Sep 21, 2011 1:21 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: A null pointer was found where one shouldn't exist
- Replies: 1
- Views: 5364
A null pointer was found where one shouldn't exist
Hi All,
I am getting below error.can anyone help me to sort out the issue.
ODBC_Connector_3,0: [IIS-CONN-ODBC-000011] A null pointer was found where one shouldn't exist (CC_OdbcDBRecordDataSetProducer::dbsReadBindBuffers, file CC_OdbcDBRecordDataSetProducer.cpp, line 671)
thanks in advance.
I am getting below error.can anyone help me to sort out the issue.
ODBC_Connector_3,0: [IIS-CONN-ODBC-000011] A null pointer was found where one shouldn't exist (CC_OdbcDBRecordDataSetProducer::dbsReadBindBuffers, file CC_OdbcDBRecordDataSetProducer.cpp, line 671)
thanks in advance.
- Wed May 04, 2011 3:53 pm
- Forum: General
- Topic: how to exit the loop in between 12 runs
- Replies: 5
- Views: 3531
- Wed May 04, 2011 3:30 pm
- Forum: General
- Topic: how to exit the loop in between 12 runs
- Replies: 5
- Views: 3531
- Wed May 04, 2011 9:37 am
- Forum: General
- Topic: how to exit the loop in between 12 runs
- Replies: 5
- Views: 3531
how to exit the loop in between 12 runs
Hi, i am taking count from the table,if count is '0' then i need to stop my process for 2hrs.But for every ten minits i have to check count=0 or greater than zero. i have created sequencer like this job---->ec---->nc---->startloop---->wff----->job---->ec---->nc----->endloop i have set the loop to ru...
- Wed Apr 06, 2011 4:25 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: i have 3 records,in that i want to delete first record
- Replies: 3
- Views: 2975
i have 3 records,in that i want to delete first record
Hi ,
I want to delete the first record from below example
eno,ename,sal
100,abc,16678
100,xyz,77878
100,rts,6464884
from above list i want to populate last two rows to target.
can anyone help me on this
thanks inadvance
I want to delete the first record from below example
eno,ename,sal
100,abc,16678
100,xyz,77878
100,rts,6464884
from above list i want to populate last two rows to target.
can anyone help me on this
thanks inadvance
- Wed Apr 06, 2011 4:21 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: my job is taking 45 minits to load the data
- Replies: 14
- Views: 9254
- Fri Apr 01, 2011 12:35 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: my job is taking 45 minits to load the data
- Replies: 14
- Views: 9254
Thanks ray,sorry for the late reply,i was on leave i have done that,when i am loading into sequential file it is not taking time. whenever i am trying to load the data into ORACLE i am getting this problem. i think there may be some indexes on key columns,i will check and let you know guys. thanks a...
- Tue Mar 29, 2011 6:06 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: my job is taking 45 minits to load the data
- Replies: 14
- Views: 9254
- Tue Mar 29, 2011 5:51 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: my job is taking 45 minits to load the data
- Replies: 14
- Views: 9254
- Tue Mar 29, 2011 4:26 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: my job is taking 45 minits to load the data
- Replies: 14
- Views: 9254
my job is taking 45 minits to load the data
Hi All, My job design is like this dataset----->transformer------->odbc connector my job is having 169000 records,i am using update then insert to load the data.It is taking 45 minits to load the data.I am using HASH partitioning in transformer and odbc stages. can anyone please suggest me how to im...
- Wed Nov 17, 2010 7:36 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: How can I convert a string into a date?
- Replies: 4
- Views: 2979
there was space issue with the date,so trim the data and then applied the type conversion function.Now its working finepavankatra wrote:thank you for your replyArndW wrote:Your date format is incorrect, it should read "%dd-%mmm%-%yyyy" ...
i was tried ,but its not working.
Thanks for your support.
- Wed Nov 17, 2010 6:44 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: How can I convert a string into a date?
- Replies: 4
- Views: 2979
- Wed Nov 17, 2010 6:04 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: How can I convert a string into a date?
- Replies: 4
- Views: 2979
How can I convert a string into a date?
Hi, my input is 26-feb-2010,i am reading as varchar in the source Now i want to populate into date column. i was used below function StringToDate(Trim(lk_read.expiry_date),"%yyyy-%mmm-%dd"). after executing the job i am getting output as astroids(*********) Can anyone pleaase help me to so...
- Fri Aug 13, 2010 4:52 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: getting error when compiling the Datastage job
- Replies: 12
- Views: 39963
Is this your first job with a transformer it in ? Is this a new installation ? Then it implies that you have not installed or configured your C++ compiler. ... thanks sainath, yes its new instalation,earlier the code was in windows.now moved to linux server.by default linux having c++ , i think it ...