Search found 95 matches

by evee1
Wed May 18, 2011 9:45 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Problem when calling SP stage
Replies: 12
Views: 7386

Problem when calling SP stage

I'm struggling a bit to get the connectivity to the DB in my environement. It's a new project, no "real" Datastage environement yet (it's coming soon), but there is an existing Oracle database on the UNIX server. So in the meantime I have uploaded an image of VM with a Datastage server ont...
by evee1
Wed May 18, 2011 8:11 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Error in OCI stage
Replies: 7
Views: 2749

I think I will. I just didn't want to double up posts.
I managed to fix THIS problem, but I'm having another one :-(. So see you in the other post.
by evee1
Wed May 18, 2011 5:43 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Error in OCI stage
Replies: 7
Views: 2749

Hello, have you managed to solve this issue?
by evee1
Thu May 12, 2011 12:27 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Wrapped Unix command terminated with error
Replies: 1
Views: 1279

Sorry, I've just realised I was checking on the wrong system :oops:.
No, I can go ahead with the rest of the tests I'd like to do.
by evee1
Wed May 11, 2011 10:59 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Wrapped Unix command terminated with error
Replies: 1
Views: 1279

Wrapped Unix command terminated with error

We have number of UNIX shell scripts that I would like to run in DS, in a parallel fashion and I thought I would explore the wrapped parallel stages. So I have created a wrapped parallel stage that runs "test -s" UNIX command. When I'm running a job that contains this stage (and only this ...
by evee1
Tue May 03, 2011 7:08 pm
Forum: General
Topic: General design principle for DataStage
Replies: 9
Views: 6490

In my current engagement, I am using fewer than 12 jobs, but they are generic, dynamic and multi-instance. I have just started a project (early design yet) that has the same goal in mind. It is a re-write of the existing DWH using Datastage instead of a bunch of varying technolgies used currently f...
by evee1
Tue May 03, 2011 12:33 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Discussion about Late Arriving Dimensions
Replies: 11
Views: 8517

Thanks you all for our contribution.
by evee1
Wed Apr 20, 2011 5:34 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Discussion about Late Arriving Dimensions
Replies: 11
Views: 8517

Maybe I did not take my smart pills today but even if you mark these records as stub records and assign a true surrogate key without a natural key(the dimension code), how are you later going to identify and assign the right stub record with its correct dimensional value. Sorry OP for hijacking you...
by evee1
Thu Apr 07, 2011 11:33 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Issue with connecting to Oracle via ODBC Connector stage
Replies: 2
Views: 7878

Thanks. It worked!! Both ODBC Connector and Oracle EE stage.
It seems that when both DS and DB are on the same machine I must use SID rather than machine ip address.
by evee1
Tue Apr 05, 2011 1:16 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Issue with connecting to Oracle via ODBC Connector stage
Replies: 2
Views: 7878

Issue with connecting to Oracle via ODBC Connector stage

Hi, We have an Oracle database installed on the same Linux box as the Datatstage. I'm trying to test DB connectivity from within the Datastage job while running the Datastage client on my local machine. I CAN connect to my test database from an Oracle Connector stage (it looks like it's using TNS li...
by evee1
Wed Mar 30, 2011 8:09 pm
Forum: General
Topic: Training for certification
Replies: 11
Views: 7176

Thank you. I think I will pass on the printed certficate just now. PDF will do :).
by evee1
Sun Mar 20, 2011 9:58 pm
Forum: General
Topic: Training for certification
Replies: 11
Views: 7176

Thanks for all the suggestions! They must have helped as I have passed the exam!! Having achieved that I now know what areas I need to study more :-).
by evee1
Wed Mar 16, 2011 9:39 pm
Forum: General
Topic: Training for certification
Replies: 11
Views: 7176

Thanks cppwiz. I have already found and read your thread and it was very helpful. I took advantage of the Take It Again promotion, so I feel a bit less stressed. I also downloaded some 130 test questions and can actually come up with the correct answer to many of them ;-). So I'll try to do my best ...
by evee1
Mon Mar 14, 2011 9:17 pm
Forum: General
Topic: Training for certification
Replies: 11
Views: 7176

On-line mock certification exam

Hi, I'm also in the process of preparation for the certification exam for 8.5. I have been using DS for few years, but there are still plenty of topic I'm not familiar with. I'm going through the Red Books and the documentation at the moment. I was also under the impression that there was a mock on-...
by evee1
Thu Nov 05, 2009 9:04 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Job substituting default params in place of the passed ones
Replies: 13
Views: 3629

After a long week, I could be reading your issue completely wrong but have you tried getting your routine to send a few strings to the logs? For your parameter to appear blank on the other side sounds like the routine is somehow bypassing the bit of code that sets the return value. No, I haven't tr...