Search found 80 matches
- Fri Sep 15, 2017 6:12 am
- Forum: General
- Topic: Timer already cancelled error while trying to login
- Replies: 6
- Views: 4507
- Thu Sep 14, 2017 2:11 pm
- Forum: General
- Topic: Timer already cancelled error while trying to login
- Replies: 6
- Views: 4507
- Thu Sep 14, 2017 1:52 pm
- Forum: General
- Topic: Timer already cancelled error while trying to login
- Replies: 6
- Views: 4507
Timer already cancelled error while trying to login
Hi All,
we are trying to login to datastage designer/director version 11x but facing the below error. Please can any one suggest how to fix this?
Ravi.
we are trying to login to datastage designer/director version 11x but facing the below error. Please can any one suggest how to fix this?
Thanks,Failed to authenticate the current user against select Services Tier
IllegalStateException : Timer already cancelled
Ravi.
- Tue Sep 01, 2015 11:47 am
- Forum: General
- Topic: How do I create a basic Sequencer?
- Replies: 16
- Views: 8057
- Tue Sep 01, 2015 11:24 am
- Forum: General
- Topic: Understanding Job Logs
- Replies: 4
- Views: 5821
Hi, We are running our jobs on 11.3 version in both the environments. Both the environments have WLM disabled. There is a datastage installation team who does the installations for us. Once they finish the installation and give box back to us, we import our jobs and start executing. So from our side...
- Tue Sep 01, 2015 5:03 am
- Forum: General
- Topic: Understanding Job Logs
- Replies: 4
- Views: 5821
Hi Craig, Thanks for the response. Is there any way I can get the details why the job is starting after 2mins it was requested to run? :roll: I am trying to understand this so that I can reduce this time, currently we have around 1500 jobs executing in different sets. Some times we obeserved that at...
- Mon Aug 31, 2015 2:44 am
- Forum: General
- Topic: Understanding Job Logs
- Replies: 4
- Views: 5821
Understanding Job Logs
Hi, Please can anyone help me understand what is happening with my job logs. We have a sequence in which we call 3 jobs and 3 shell scripts all called in a sequence one after the other. Below is the summary of the sequence LD_EXTR_SEQ_SB_ADAPTIV.SZ.JobControl (@Coordinator): Summary of sequence run ...
- Mon May 11, 2015 12:49 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: understanding delay in Director log
- Replies: 5
- Views: 3487
- Tue Apr 07, 2015 9:07 am
- Forum: General
- Topic: Execute n number of jobs at a time
- Replies: 13
- Views: 7118
pssstttt... he's suggesting you skip 9.1 and aim your upgrade sights a little... higher. :wink: I guess I did not read it right :lol: Currently we have the datastage upgraded to 9.1. Not sure when will we reach the 11.x version which Eric was mentioning :roll: Please can you advise where can I find...
- Tue Jan 27, 2015 10:32 pm
- Forum: General
- Topic: Execute n number of jobs at a time
- Replies: 13
- Views: 7118
- Tue Jan 27, 2015 7:12 am
- Forum: General
- Topic: Execute n number of jobs at a time
- Replies: 13
- Views: 7118
- Thu Jan 22, 2015 3:28 am
- Forum: General
- Topic: Execute n number of jobs at a time
- Replies: 13
- Views: 7118
Execute n number of jobs at a time
Hi, I am not sure as to which forum my question goes. So I have posted in General forum. Requesting moderator to move the post to appropriate forum. My Question: We are working on Datastage 8.7 and have around 200 jobs in a datastage project. There is no dependency between jobs . We want to design t...
- Tue Dec 17, 2013 2:02 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: understanding delay in Director log
- Replies: 5
- Views: 3487
I can try removing the before SQL statement. But when we see the logs the Before SQL statment log is being shown only after 2secs. Is it that before showing the config file log, the Before SQL statement is executed? Also there are only 7000 records in the table and an Index also is defined on the ke...
- Mon Dec 16, 2013 11:16 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: understanding delay in Director log
- Replies: 5
- Views: 3487
understanding delay in Director log
Hi, We have a job with three stages. OracleConnector ->Copy->OracleConnector. The job does a simple pull from Source. And in the target we INSERT the records with a DELETE statement defined in BeforeSQL Statement . When I observe this particular job there is a log showing the configuration file. But...
- Mon Nov 05, 2012 11:55 am
- Forum: General
- Topic: BeforeJobSubroutine taking time while executing Unix script
- Replies: 0
- Views: 1190
BeforeJobSubroutine taking time while executing Unix script
Hi, I have kind of a weird situation in one of the Datastage projects. There are two subroutines(R1 and R2) which I am using as the BeforeJobSubroutines. Both these subroutines have almost same funcationality as below 1. When a job is started i call the subroutine through the job, connect to databas...