Search found 97 matches
- Thu Jul 25, 2013 4:14 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Can I use DataStage to backup records?
- Replies: 6
- Views: 3101
- Tue Jul 16, 2013 1:02 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Can I use DataStage to backup records?
- Replies: 6
- Views: 3101
- Tue Jul 16, 2013 12:20 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Can I use DataStage to backup records?
- Replies: 6
- Views: 3101
Can I use DataStage to backup records?
Hi All,
I need to take a backup of records of 1 year at the end of every seventh year.
How could we implement this scenario .
Thanks
Sunitha
I need to take a backup of records of 1 year at the end of every seventh year.
How could we implement this scenario .
Thanks
Sunitha
- Tue Jan 08, 2013 11:29 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: multiple instance
- Replies: 3
- Views: 2373
- Tue Jan 08, 2013 11:12 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: multiple instance
- Replies: 3
- Views: 2373
multiple instance
HI,
I created a generic load job which loads source table into target table.
This job should loads mutiple source tables from one server into multiple tables in another server .
Please let me know how can this be achieved .
Thanks in advance.
Thanks
Sunitha
I created a generic load job which loads source table into target table.
This job should loads mutiple source tables from one server into multiple tables in another server .
Please let me know how can this be achieved .
Thanks in advance.
Thanks
Sunitha
- Mon Dec 03, 2012 5:35 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Teradata table laod ERROR
- Replies: 3
- Views: 4259
- Fri Nov 30, 2012 8:24 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Teradata table laod ERROR
- Replies: 3
- Views: 4259
Teradata table laod ERROR
Hi All, I'm trying to use a CCD stage to capture the delta data loaded. The design is 2 teradata connector stages connected to CCD stage and the target stage is teradata connector stage. I'm unable to eliminate the change_code column from the preceding stage. the records are loaded till the last lin...
- Fri Jun 08, 2012 1:24 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: migration DS code to Grid
- Replies: 4
- Views: 2961
- Thu Jun 07, 2012 11:37 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: migration DS code to Grid
- Replies: 4
- Views: 2961
migration DS code to Grid
Hi All,
We are planning to migrate our DS code to Grid.
Please let me know the changes to be done in DS Jobs if we migrate to Grid.
Thanks
Sunitha
We are planning to migrate our DS code to Grid.
Please let me know the changes to be done in DS Jobs if we migrate to Grid.
Thanks
Sunitha
- Tue Feb 07, 2012 5:56 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Logic to implement
- Replies: 8
- Views: 3721
- Tue Feb 07, 2012 3:32 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Logic to implement
- Replies: 8
- Views: 3721
- Tue Feb 07, 2012 2:28 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Logic to implement
- Replies: 8
- Views: 3721
- Tue Feb 07, 2012 12:35 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Logic to implement
- Replies: 8
- Views: 3721
Logic to implement
Hi, I have a requirement in the below manner. I need to mask some values in 18 byte data sent to me . The value is read in 1byte to 9 byte . Few values need to be masked the data extracted is numeric but after masking they result in numeric and non numeric values. req 123456789 output 1M3AXSD89 Coul...
- Sun Jan 09, 2011 7:14 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: NO MORE SPOOL SPACE IN PROJECT
- Replies: 1
- Views: 3262
NO MORE SPOOL SPACE IN PROJECT
Hi, When loading data from dataset TO teradata stage we could see the following error no more spool space in project. table exists:failed on query :lock row access select count (*) from database. Table does not exist ,cannot use truncate mode. cannot prepare target table. appreciate your help on this.
- Tue Dec 21, 2010 7:47 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: table dropping
- Replies: 0
- Views: 1097
table dropping
Hi , we are loading some records from a dataset to a teradata stage. At this point of time temp tables are created in teradata. The job design is dataset ->transformer->teradatastage(write mode is truncate). but the issue is job aborting and table dropped when data is loaded into the tablename1. The...