I Dont have the Parallel extender software or documents. Can i get the trial version of Software.
Thanks
srinivas.parsi
[quote="parsi_cnu"]Hi ,
I want to know what is the minimum configuration needed to run the parallel extender job .
Thanks
srinivas.parsi[/quote]
Search found 43 matches
- Tue Sep 05, 2006 12:20 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Minimum Hardware Requirements for Running parallel job
- Replies: 6
- Views: 1853
- Thu Aug 31, 2006 12:35 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Working on Server Job
- Replies: 1
- Views: 629
Working on Server Job
Hi everybody,
Working on server job since a while wanted to try to install and run the parallel extender on my machine. Can i able to download directly from site or do they send me Cd if i request for it.
Working on server job since a while wanted to try to install and run the parallel extender on my machine. Can i able to download directly from site or do they send me Cd if i request for it.
- Thu Aug 31, 2006 9:07 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Minimum Hardware Requirements for Running parallel job
- Replies: 6
- Views: 1853
Minimum Hardware Requirements for Running parallel job
Hi ,
I want to know what is the minimum configuration needed to run the parallel extender job .
Thanks
srinivas.parsi
I want to know what is the minimum configuration needed to run the parallel extender job .
Thanks
srinivas.parsi
- Sun Jul 17, 2005 1:41 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: From Hash file to loading Table
- Replies: 9
- Views: 1821
additional information about the question
The date in the hash file is stored in the Timestamp format and i am getting the timestamp format as it is and storing in the oracle table in timestamp format
Thanks
sri
Thanks
sri
- Sun Jul 17, 2005 12:54 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: From Hash file to loading Table
- Replies: 9
- Views: 1821
From Hash file to loading Table
Hi, i am storing the snapshot_date in the Hash file and if matches i am getting the snapshot_date but i am getting error ORA-01841: (full) year must be between -4713 and +9999, and not be 0. The same hash file working good in another job but i am getting error in one job. So what should i do shall i...
- Thu May 26, 2005 11:49 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: insert/ update
- Replies: 0
- Views: 398
insert/ update
Hi ,
i had to load 3 millions of records using insert/update as update action in target table it is taking for ever. so i thought of using orabulk loader can anybody tell what are the options i had to give to run the bulkloader and parameters i had to set for collecting bad data.
Thanks
sri
i had to load 3 millions of records using insert/update as update action in target table it is taking for ever. so i thought of using orabulk loader can anybody tell what are the options i had to give to run the bulkloader and parameters i had to set for collecting bad data.
Thanks
sri
- Tue May 24, 2005 1:29 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Running a simple ds job error i am getting
- Replies: 2
- Views: 658
Running a simple ds job error i am getting
HI everybody, when i am running a simple datastage job i am getting this error DataStage Job 59 Phantom 22061 Program "DSD.StageRun": Line 544, Attempted WRITE with NULL record ID DataStage Phantom Finished. since it is running in sequencer when this job success only it has to go to other ...
- Tue May 24, 2005 11:04 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: How to run dimension jobs in parallel with sequencer
- Replies: 8
- Views: 1684
HI everybody, I am using routine to get last runtime parameter for the job. since i am using the same hashfile to store all the last run time parameter of the jobs may be the routine is locking the hash file to access other jobs. I dont know based on ur references i am assuming that may be the case....
- Mon May 23, 2005 8:10 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: How to run dimension jobs in parallel with sequencer
- Replies: 8
- Views: 1684
- Mon May 23, 2005 6:57 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: How to run dimension jobs in parallel with sequencer
- Replies: 8
- Views: 1684
How to run dimension jobs in parallel with sequencer
Hi everybody,
How to run the dimension jobs in parallel. since all the jobs are independent of other. I am trying to use sequencer job to do that. But i couldnt succed. can anybody put some light on it.
Thanks in advance
Bye
sri
How to run the dimension jobs in parallel. since all the jobs are independent of other. I am trying to use sequencer job to do that. But i couldnt succed. can anybody put some light on it.
Thanks in advance
Bye
sri
- Thu May 19, 2005 7:34 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Merge Stage
- Replies: 1
- Views: 635
Merge Stage
Hai everybody,
I want to use merge stage to insert or update large volumes of data but what i couldn't figure it is what join type i should use basically i want to insert or update to my target table.
Thanks
sri
I want to use merge stage to insert or update large volumes of data but what i couldn't figure it is what join type i should use basically i want to insert or update to my target table.
Thanks
sri
- Tue May 17, 2005 11:53 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Hash file lookup
- Replies: 1
- Views: 620
Hash file lookup
Hi Everybody,
In the sequencer job im using a hash file routine and i want to capture that value and give input to the following job in sequencer. can anybody how to do.
Advance
Thanks
sri
In the sequencer job im using a hash file routine and i want to capture that value and give input to the following job in sequencer. can anybody how to do.
Advance
Thanks
sri
- Mon May 09, 2005 2:12 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Datastage Routine HashLookup
- Replies: 1
- Views: 914
Datastage Routine HashLookup
Hi Everybody, I am getting last run date from the job and using that parameter for the current job to get only refershed data. I am using HashLookup Routine anda given the hashfilename, lookup column and position . It worked fine in my Test env in DSManager but when i ran the same routine to excute ...
- Thu May 05, 2005 3:32 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Abrupt termination of JOb
- Replies: 2
- Views: 1048
Abrupt termination of JOb
Hi Everybody,
Im running a job it is giving Abnormal termination of stage jobname detected and aborting the job. This job ran fine before. Any idea why it is doing so.
Thanks
sri
Im running a job it is giving Abnormal termination of stage jobname detected and aborting the job. This job ran fine before. Any idea why it is doing so.
Thanks
sri
- Fri Apr 22, 2005 10:40 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Hash lookup
- Replies: 3
- Views: 754
HASH LOOKUP
HI ARNOLD, SORRY I DONT MEAN LIKE THAT. THANKS FOR THE REPLY [quote="ArndW"]Hello Parsi, first of all, [color=red]PLEASE DON'T SHOUT AT US WHEN WE HAVEN'T DONE ANYTHING WRONG[/color]. The [i]UtilityHashLookup[/i] accepts the hash file name as the first parameter, it does not accept this fi...