Search found 47 matches

by vputta
Wed Apr 11, 2012 6:14 am
Forum: IBM QualityStage
Topic: Suspect matchng in Qualitystage
Replies: 3
Views: 3256

I have all the 100 million records in one dataset . My objective is to identify the suspects .Can we achieve this through Qualitystage ?
Can you plz explain me the detailed job design .

Thanks
by vputta
Mon Mar 12, 2012 8:01 am
Forum: IBM QualityStage
Topic: Suspect matchng in Qualitystage
Replies: 3
Views: 3256

Suspect matchng in Qualitystage

HI I have an requirement to perform suspect matching in Quality stage . we have all the source data in one dataset . This dataset has the below information - First name,last name,Address,Gender,Phone number I need to identify the suspects from this file . Rules - If First name,last name,Address,Phon...
by vputta
Wed Sep 21, 2011 6:55 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Current TimeStamp as parameter
Replies: 4
Views: 2576

I need to use this timestamp parameter in the output sequential file name .
I guess we can do this only through Job execution code .
Plz suggest

-Thanks
by vputta
Tue Sep 20, 2011 2:34 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Current TimeStamp as parameter
Replies: 4
Views: 2576

Current TimeStamp as parameter

Hi , I need to pass Current Timestamp as a parameter to the DS job . But i am having problem to execute the below code in Job control of the DS job . -------------------------------------------------------------------------------------- $INCLUDE DSINCLUDE JOBCONTROL.H Job_Handle=DSJ.ME JobName=DSGet...
by vputta
Sat May 08, 2010 5:06 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: parallel sub routines
Replies: 8
Views: 3665

I need documents on Basic before/after parallel subroutine.

I have worked on Basic server routines .could we ue the same functions in creating parallel sub routines as well ?

plz provide the docs for Basic server subroutine as well..


Thanks,
vamsi
by vputta
Fri May 07, 2010 9:51 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: parallel sub routines
Replies: 8
Views: 3665

parallel sub routines

Need good manual on Parallel sub routines

Thanks,
vputta
by vputta
Fri Jan 08, 2010 5:42 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How to export message Handler from one project to Other
Replies: 7
Views: 12112

I have an project level message handler. I dont have any job level msg handler.

So, i need to export the project level msg handler to other project.

Thanks,
Vamsi
by vputta
Fri Jan 08, 2010 5:27 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How to export message Handler from one project to Other
Replies: 7
Views: 12112

How to export message Handler from one project to Other

I have Messgae Handler in DS project on one server.
I want to export it to DS project on other server. How can i do that ?

Thanks,
Vamsi
by vputta
Mon Dec 28, 2009 3:44 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Warning (Unrecognized top level format property) in 7.5.1
Replies: 4
Views: 2644

Warning (Unrecognized top level format property) in 7.5.1

While Loading Data in oracle using Oracle Enterprise Stage , got the below warning .
"When checking operator: When validating export schema: Unrecognized top level format property: nocheck"
Please suggest , how to get rid of this

Thanks
by vputta
Tue Nov 03, 2009 6:22 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How do we achieve right and Full outer joins in Lookup
Replies: 4
Views: 3117

You mean stream should be made Reference and vice versa ?
by vputta
Tue Nov 03, 2009 6:05 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How do we achieve right and Full outer joins in Lookup
Replies: 4
Views: 3117

How do we achieve right and Full outer joins in Lookup

How do we achieve right and Full outer joins in Lookup.I could not do it with setting lookup conditions for stream and reference links . Lookup failure condition - Stream Reference Normal Join - Drop Drop Left outer - Continue Continue Right Outer - ? ? Full outer - ? ? Thanks.
by vputta
Mon Aug 17, 2009 6:52 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How to trigger one link after the other
Replies: 7
Views: 2001

Yeah i agree that it depends upon the no. of recs being updated thru the query.
So if i want to run the second update query after the first i need to break the job into 2 ?
by vputta
Mon Aug 17, 2009 5:55 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: How to trigger one link after the other
Replies: 7
Views: 2001

How to trigger one link after the other

I have a parallel job which has a transformer stage with 2 output links.Separate constraints will be there for each link.Both the output links will be connected to DB2/UDB enterprise stages which have Update queries to Update the same tables. So, as we know that we cant Update the same table at a ti...