Search found 13 matches

by mayur25
Fri May 11, 2012 4:52 am
Forum:
Topic: Best Practice to maintain/Import Metadata repository
Replies: 3
Views: 1542

That's a very good question, and is being answered by engineering as we evolve into 8.7 and beyond with InfoSphere Metadata Asset Manager. The Metadata Asset Manager is a central location for perfor ... Thanks Ernie !! Looks like we have some opportunity within tool to have centralised import mecha...
by mayur25
Thu May 10, 2012 4:06 am
Forum:
Topic: Best Practice to maintain/Import Metadata repository
Replies: 3
Views: 1542

Best Practice to maintain/Import Metadata repository

HI, I am looking to find a best practice to import metadata(Table Definition) to Information server suite. We have many options to import metadata but which one will be more efficient? 1. Import though Datastage. 2. Import through Information Analyzer. 3. Import though Bridge. I am looking to create...
by mayur25
Mon Apr 02, 2012 6:16 am
Forum:
Topic: Automated services in Metadata Workbench
Replies: 4
Views: 1569

Thats Really good, If it won't disturb my manual bindings then it will really help. I am sure there is not configuration required for this.

WIll try and shre my feedback on the same.
Thanks !!
by mayur25
Mon Apr 02, 2012 6:04 am
Forum:
Topic: Getting Start with Metadata Workbench
Replies: 5
Views: 1908

Re: Getting Start with Metadata Workbench

Hi VincyTing,

Go though Ernie's blog you will get better understanding as well as good start.

There are some limitations in 8.1 version but i believe 8.7 version addressed most of limitations.
by mayur25
Mon Apr 02, 2012 5:59 am
Forum:
Topic: Unwanted jobs in Production Environme for Automation binding
Replies: 2
Views: 1789

We are following below practice in order to achieve requested answer. 1. Create an environment which can have only Production jobs which runs through scheduling tool on some frequently manner. 2. Adhoc fixes or online jobs should be moved to different ETL Project on the same server. by following abo...
by mayur25
Mon Apr 02, 2012 5:37 am
Forum:
Topic: Error while running script ProcessEnvVariables.sh
Replies: 2
Views: 2087

Re: Error while running script ProcessEnvVariables.sh

Can you please let us know the purpose of running this script?
In case if this script runs fine what benefit you are gaining over here?
by mayur25
Mon Apr 02, 2012 5:30 am
Forum:
Topic: Automated services in Metadata Workbench
Replies: 4
Views: 1569

Thanks Arvind !! In case if i change the glossary term or any existing component which was linked as part of my previous run and while running the automated services second time, will it link automatically or it should be done manually. Second question is, Whatever was done as part of automated serv...
by mayur25
Mon Apr 02, 2012 4:47 am
Forum:
Topic: Automated services in Metadata Workbench
Replies: 4
Views: 1569

Automated services in Metadata Workbench

Hi, I am using IBM Information Server 8.1 Scenario: We have multiple ETL projects created under 1 engine. From multple projects we have different subject areas within 1 ETL Project. 1. Have E2E lineage for 1 ETL Project. 2. Since we have more than 10 subejct areas we have divided the initiative into...
by mayur25
Mon Aug 09, 2010 9:40 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: DataStage is down
Replies: 8
Views: 4670

Re: DataStage is down

priyadarshikunal wrote:
synsog wrote: When you say Datastage is dowm means dsrpc is not running.
:?
Priyadarshikunal you are right !!!
The question it self is not clear and need more attention on the requirement.
by mayur25
Tue Aug 03, 2010 8:38 pm
Forum: General
Topic: Job Locks
Replies: 3
Views: 2663

In version 8 the better mechanism is to disconnect the session using Web Console for Information Server. When you open the job you get a dialog showing the owner of the lock. That's the session ID that you need to disconnect. Thanks Ray !! Some time i have seen that if your job is locked by ABC use...
by mayur25
Tue Aug 03, 2010 10:50 am
Forum: General
Topic: Job Locks
Replies: 3
Views: 2663

Re: Job Locks

Hi, Iam having trouble with the locks. My job is getting locked if i leave it for some time. Then i need to wait for some time. Is there any way to release the job from lock.... if so can you please guide me with the steps. Login to Datasatage Administrator Go to Properties ->go to command type LIS...
by mayur25
Mon Aug 02, 2010 9:44 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Convert CSV to Pipe delimited
Replies: 3
Views: 4460

Re: Convert CSV to Pipe delimited

Hi All, I want to convert the CSV file to Pipe delimited file Ex:"aaa","bbb",""Wow!!!" this is good","ddd" to aaa|bbb|"Wow!!!" this is good|ddd Experts ideas will really help. Thanks in advance. If you already have a file Created then you ...
by mayur25
Wed Dec 03, 2008 10:57 am
Forum: IBM QualityStage
Topic: Match_Frequency Error: Input not sorted at record #
Replies: 8
Views: 10785

RE: Input data not sorted

hii i am working on Quality stage i am also getting same error. till standardization evrything was working properly then i am using that stan o/p file to get match freq report but it gives me error that Input data not sorted # can anyone give valuable suggetion. thanks in advance Have you tried expl...