Search found 5 matches

by cpvnprasad
Sun Apr 13, 2008 2:56 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Can we do sum in transformer stage?If yes how?
Replies: 18
Views: 17718

Hi to all

Ray,i have done in the transformer stage itself.

actually the same problem i have faced previously,
by doing the same way i have done it...

Thanks
by cpvnprasad
Thu Apr 03, 2008 8:13 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Running the jobs in sequence and looping upto certain time
Replies: 4
Views: 1943

Very thanks for your reply

Yeah i have tried to schedule the job,but i am not able to find the way for scheduling, there i am able to see only time option like at what time i have to run the job. This is all i have done in datastage Manager.
by cpvnprasad
Thu Apr 03, 2008 8:00 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Can we do sum in transformer stage?If yes how?
Replies: 18
Views: 17718

Hi

I have another idea for this,there is an inbuilt aggregator which we will get the same result as you are looking for.
by cpvnprasad
Wed Mar 26, 2008 8:41 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Running the jobs in sequence and looping upto certain time
Replies: 4
Views: 1943

Running the jobs in sequence and looping upto certain time

Hi, I have a prob in data stage. I have a sequencer which I have scheduled for 3 AM. I want it to run continuously even after it is finished till time is 6 AM. That means the job starts at 3 AM, finishes, runs once again, finishes and runs once again till 6 AM. After 6 AM it should finish and not ru...
by cpvnprasad
Wed Mar 26, 2008 8:33 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Problem with Lock
Replies: 7
Views: 2875

Re: Problem with Lock

For Clearing the lock,just go to datastage director,from there goto cleanup resources tab, from there you can logout the corresponding job whcih will clear the lock of that corresponding job.