Error calling subroutine: DSR_EXECJOB (Action=5); check DataStage is set up correctly in project AHAKORPROD (Subroutine failed to complete successfully (30107)) I was having a similar error and it seemed the job was corrupted. I made a copy of the job, made sure it worked then deleted the old one a...
Error calling subroutine: DSR_EXECJOB (Action=5); check DataStage is set up correctly in project AHAKORPROD (Subroutine failed to complete successfully (30107)) I was having a similar error and it seemed the job was corrupted. I made a copy of the job, made sure it worked then deleted the old one a...
Error calling subroutine: DSR_EXECJOB (Action=5); check DataStage is set up correctly in project AHAKORPROD (Subroutine failed to complete successfully (30107)) I was having a similar error and it seemed the job was corrupted. I made a copy of the job, made sure it worked then deleted the old one a...
Hi all, I am in great need , pls help me. I have scheduled to run jobs in production. Now for the following couple of days the below error is coming if i open the Director Error calling subroutine: DSR_EXECJOB (Action=5); check DataStage is set up correctly in project AHAKORPROD (Subroutine failed t...
I have read somewhere that clear.&ph& command would clear all log files of a particular project at one shot, if executed at command line at datastage admin .
I tried in vain.Any suggestions about that command would be helpful
323032303230 is the hex equivalent of "202020". So, somewhere, a "raw to hex" conversion was being performed, either automatically because you're reading it into a VarChar or because you asked for it ... hi, Got it , i converted it explicitly to hex using iconv function Thanks f...
Hi, I have a requirement To extract varbinary fields from a table say X , do some manipualtions and inset the changed record in same table X. But the problem is varbinary fields are getting changed For eg in source table the field is like 202020 , when i extracted them to seq file they were becoming...
Hi, I Need 5 sequences to be imported to another project. whien i am trying to import sequences all 4 are coming fine but with the 5th seq an error message like "check whether datastage is set up correctly in you machine or not " is coming and the 5 th seq is imported without any design tm...