Search found 376 matches

by Nagaraj
Wed May 04, 2011 11:07 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Job fails
Replies: 10
Views: 4436

1.Tried with the Oracle EE stage, same error message appears,
also tried changing the paremeters, auto buffering mode etc.
2. Tried simplifying the Job to read from db and copy stage followed by Dataset.


all of them are sending out the same error message at the source stage itself.
by Nagaraj
Wed May 04, 2011 10:41 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Job fails
Replies: 10
Views: 4436

Also changed the LKp to reference Datasets instead of Database, still the issue exists.
by Nagaraj
Wed May 04, 2011 10:25 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Job fails
Replies: 10
Views: 4436

I have checked the disck space everything looks fine to me,
the disk on which DS in installed is only 30% filled
and the data files directory is only 35% filled.

so its clearly not an issue with the disk space.

and also the ulimit -a is set to unlimited and i am running on 32 bit linux OS.
by Nagaraj
Wed May 04, 2011 10:09 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Jobs aborted with "Write to dataset failed"
Replies: 12
Views: 26849

Any other ideas to get around this block write failure.
by Nagaraj
Wed May 04, 2011 9:59 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Job fails
Replies: 10
Views: 4436

Job fails

i have a pretty simple design oracle connector----> TFM--->LKP--->dataset the source is based on 3 views joined together, rows are about 5 million. trying to run the job on default config first i.e 1 node. The job fails with the following message. APT_CombinedOperatorController,0: Write to dataset o...
by Nagaraj
Thu Apr 28, 2011 9:06 am
Forum: Site/Forum
Topic: white papers too good.
Replies: 8
Views: 8197

like

Well, I'd recommend looking at the popular topics on DSX and write a paper on them
I like this idea.

sometimes we might get unlucky with the topics we are searching for.
I would love to read some white paper like that.
by Nagaraj
Wed Apr 27, 2011 3:20 pm
Forum: Site/Forum
Topic: white papers too good.
Replies: 8
Views: 8197

How about on other tools like which are coming with the IS suite

Metadata work bench
Fasttrack
Discovery
BluePrint
by Nagaraj
Tue Apr 26, 2011 12:02 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: oracle connector issue
Replies: 1
Views: 2360

Ahhhh got it, RCP was enabled.
by Nagaraj
Tue Apr 26, 2011 10:46 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: oracle connector issue
Replies: 1
Views: 2360

oracle connector issue

I am getting this below error, Oracle_Connector_4: Schema field change_code in input data set 0 not present in design time information. Extended field properties for this field will not be available. i dont have a field change_code in my insert statement. Job Design, Dataset-----> TFM---->Oracle Con...
by Nagaraj
Mon Apr 25, 2011 8:10 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: overlapping dates
Replies: 11
Views: 3971

start date or end_date is included so, its together 5 days.
by Nagaraj
Mon Apr 25, 2011 7:57 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: overlapping dates
Replies: 11
Views: 3971

Okay... looks like this should work. if (p_start_date>=q_start_date) if((q_end_date-p_start_date)>=4) and ((p_end_date-p_start_date)>=4) then "Overlap" else "No Overlap" fi else if((p_end_date-q_start_date)>=4) and ((q_end_date-q_start_date)>=4) then "Overlap" else &quo...
by Nagaraj
Sat Apr 23, 2011 7:39 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: ORA-00060: Deadlock detected
Replies: 7
Views: 5009

xmeta ????

nothing has stopped working, when this issue occured.
scheduled jobs are running fine and the server is doing fine.

everyday this stuff happens at mid night, so there will be no one who is logging in or trying something on the server.
by Nagaraj
Sat Apr 23, 2011 6:35 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: ORA-00060: Deadlock detected
Replies: 7
Views: 5009

Update from support

As of now, what they say is

See if there are any orphaned processes and kill them and recycle the server and check if the issue arises again.
by Nagaraj
Sat Apr 23, 2011 6:31 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: overlapping dates
Replies: 11
Views: 3971

i didn't get quite understand. svStartDateOver5Days <-- Abs(q_start_date - p_start_date) >>>> difference in days svpInterval <-- p_end_date - p_start_date >>> this would give me date difference in days as well concept ---------- 1. difference is between p_startdate p_end_date AND q_start_date q_end_...
by Nagaraj
Fri Apr 22, 2011 9:14 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: overlapping dates
Replies: 11
Views: 3971

oh sorry chulett ,

its a server job.