Search found 4 matches

by ju
Mon Jul 02, 2007 7:40 am
Forum: General
Topic: Use parameters in a job sequence
Replies: 3
Views: 1855

OK,
Thanks.
by ju
Tue Jun 26, 2007 6:31 am
Forum: General
Topic: Use parameters in a job sequence
Replies: 3
Views: 1855

Use parameters in a job sequence

Hi, 1) I would like to know if it's possible to use a parameter in a stage to send mail (in a job sequence)? For example, I would like to put in "Senders email address" a data which is situated in a configuration file and not fill the field myself. I succeed to use a data situated in a con...
by ju
Wed May 30, 2007 3:17 am
Forum: General
Topic: How retrieve ids inserted into a table with a sequence?
Replies: 4
Views: 2168

Use the date is not possible because the date is generated too. And if i selected the rows inserted in the table, i loose the id correspond in mys old file. 1) Exemple: I have a file: "IDFILE","NAME",... "TRY1","HENRY",... "TRY2","ZIDANE",....
by ju
Tue May 29, 2007 3:14 am
Forum: General
Topic: How retrieve ids inserted into a table with a sequence?
Replies: 4
Views: 2168

How retrieve ids inserted into a table with a sequence?

Hi, I must insert few rows into an oracle table. But in this table, there is a trigger which generate the id with a sequence: " IF :new.c_thrd_in_no IS NULL THEN SELECT THRD_c_thrd_in_no.nextval INTO :new.c_thrd_in_no FROM dual; END IF;" And i would like to retrieve the new ids which corre...