Search found 132 matches

by Amit_111
Tue Apr 03, 2007 11:15 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Conditional Schedulling through DS Director
Replies: 7
Views: 1965

Yes...but our client wants to use us only Datastage for all the requirements and nothing else....thats the reason searching all things in DS only
by Amit_111
Tue Apr 03, 2007 11:06 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Conditional Schedulling through DS Director
Replies: 7
Views: 1965

Thanks....the question was tough but the answer was really simple...thanks once again... :wink:
by Amit_111
Tue Apr 03, 2007 4:07 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Conditional Schedulling through DS Director
Replies: 7
Views: 1965

Conditional Schedulling through DS Director

I have two Job Sequencers(Say 'SEQ1' and 'SEQ2') which I will execute through the Scheduler in the DS Director. But the Condition is that I want to schedule the start of execution of the second sequencer 'SEQ2' only after the first sequencer is executed completely. I tried to find out such Condition...
by Amit_111
Fri Mar 30, 2007 8:26 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Multiple Instances in a Lookup
Replies: 4
Views: 1986

How are to going to find out which is the latest status for the same date since ther is no time field in it (LookUp)?? One way can be that you can write a query in the Database stage itself i.e. (Lookup table stage) and select only the latest records from there and then lookp up with the Input and t...
by Amit_111
Fri Mar 30, 2007 8:19 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Compilation of Job before Execution through Job Scheduler
Replies: 4
Views: 1589

Ok then.....One solution I can see is that I will put all the Jobs in one sequencer in which I will keep the option as 'Reset if needed then run' and then Schedule it through the director. Even if the Jobs fail the sequencer will show status as "Finished"( so no need to compile ) and since...
by Amit_111
Fri Mar 30, 2007 6:39 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Compilation of Job before Execution through Job Scheduler
Replies: 4
Views: 1589

Compilation of Job before Execution through Job Scheduler

Hi all, I have to execute some jobs through Job scheduler every week. But there are chances that the jobs might get aborted during a particular run. But now before the next run these job should be complied. I do not want to do this manually. Is there a method where all the jobs are compiled just bef...
by Amit_111
Thu Mar 29, 2007 6:15 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: How to Concatenate Data from active stages in server 6.0
Replies: 5
Views: 1561

Can you please explain the above point in detail....I didnt get your point.

Thanks in Advance.
by Amit_111
Tue Mar 27, 2007 8:42 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: How to Concatenate Data from active stages in server 6.0
Replies: 5
Views: 1561

Yes...I have that option.....But I have to do this in around 50 Jobs so I will have to add 2 Temporary files in each of these job which will not be of use also after the link collector stage there will be another (target) sequential file. At the end i will have 150 files out of which 100 are of no u...
by Amit_111
Tue Mar 27, 2007 2:49 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: How to Concatenate Data from active stages in server 6.0
Replies: 5
Views: 1561

How to Concatenate Data from active stages in server 6.0

I am using Datastage server 6.0 version. I have to concatenate data coming from two transformer stages in a sequential file. But I cant use MERGE or LINK COLLECTOR stage as these are active stages and two continous active stages are not supported. Please suggest which stage to use. Is there any stag...
by Amit_111
Sun Mar 25, 2007 12:32 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: DS Installation on UNIX
Replies: 7
Views: 1940

Thanks Guys.... I will discuss this issue with my seniors....Thanks a lot.... :D
by Amit_111
Sat Mar 24, 2007 12:58 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: DS Installation on UNIX
Replies: 7
Views: 1940

I cant because we still havent set up the UNIX server...so I just wanted to confirm before we set up all the things and also just to comfirm if i have to buy another CD( inspite of having one for windows) specially to install it on UNIX. I will appreciate if you guys also find out something regardin...
by Amit_111
Sat Mar 24, 2007 12:46 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: DS Installation on UNIX
Replies: 7
Views: 1940

DS Installation on UNIX

Hi all,


I have installed datastage6.0 on Windows Server. But i want to install it on UNIX server. will I be able to install Datastage using the same CD or Is there a different CD which needs to be installed on different OS i.e on UNIX ???