Search found 112 matches
- Fri May 14, 2010 2:44 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Checking jobstatus
- Replies: 4
- Views: 1650
- Fri May 14, 2010 2:37 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Checking jobstatus
- Replies: 4
- Views: 1650
- Fri May 14, 2010 1:36 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Checking jobstatus
- Replies: 4
- Views: 1650
Checking jobstatus
Hi, I have set of jobs which will be scheduled. Also a control table which stores the job status for each job on every run. When set of jobs will be running in a sequencer before each of those job run, a entry is made in cotrol table with few details like jobname,starttime,etc... Also will check fro...
- Thu May 06, 2010 9:26 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: PATH search failure
- Replies: 1
- Views: 1684
PATH search failure
we are getting error as (while connectiong to oracle) main_program: PATH search failure: main_program: Error loading "liborchoraclent": Could not load "liborchoraclent": The specified module could not be found. . main_program: Could not locate operator definition, wrapper, or Uni...
- Thu May 06, 2010 9:25 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: recovering install.liborchteradata
- Replies: 5
- Views: 2066
- Thu May 06, 2010 6:48 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: recovering install.liborchteradata
- Replies: 5
- Views: 2066
This file was frist as install.liborchteradata with unknown file format then when we changed it to install.liborchteradata.sh its file format got changed to .sh script Now were not able to figure out how to change it back to unknow format. As renaming is not possible, because the name is same as ins...
- Thu May 06, 2010 6:22 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: recovering install.liborchteradata
- Replies: 5
- Views: 2066
recovering install.liborchteradata
Hi,
we have a problem
install.liborchteradata file is rename to install.liborchteradata.sh
we need to revert this file to original copy as now .sh file is not the correct one.
Is the any way to recover the file to unknownformat but not to .sh script format?
we have a problem
install.liborchteradata file is rename to install.liborchteradata.sh
we need to revert this file to original copy as now .sh file is not the correct one.
Is the any way to recover the file to unknownformat but not to .sh script format?
- Thu May 06, 2010 4:31 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Job in running status, invoked again due to scheduler
- Replies: 5
- Views: 2690
- Thu May 06, 2010 3:58 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Job in running status, invoked again due to scheduler
- Replies: 5
- Views: 2690
Job in running status, invoked again due to scheduler
Hi
In 8.1, We are scheduling jobs to run at perticular time daily. What will happen if some job takes more than 24 hr on a particular, then in next schedule when it gets invoked again, it will be already in running state. what will happen to next run then?
In 8.1, We are scheduling jobs to run at perticular time daily. What will happen if some job takes more than 24 hr on a particular, then in next schedule when it gets invoked again, it will be already in running state. what will happen to next run then?
- Wed May 05, 2010 2:46 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Server is not responding
- Replies: 4
- Views: 1877
- Tue May 04, 2010 10:12 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Server is not responding
- Replies: 4
- Views: 1877
Server is not responding
Hi,
We are facing a issue while loging to the Datastage 8.0, getting an error as Server is not responding.
I checked the services "Datastage engine and Datastage telnet service", these are up.
Kindly let us know if there is any other service we need to check.
Thanks.
We are facing a issue while loging to the Datastage 8.0, getting an error as Server is not responding.
I checked the services "Datastage engine and Datastage telnet service", these are up.
Kindly let us know if there is any other service we need to check.
Thanks.
- Mon Jun 16, 2008 3:58 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Case Study for Training
- Replies: 4
- Views: 2281
Case Study for Training
Hi,
Please give me some case study which can be used for training perposes.
Thanks.
Please give me some case study which can be used for training perposes.
Thanks.
- Fri Mar 28, 2008 4:23 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Error While Installing Datastage Enterprise edition 7.5x2
- Replies: 2
- Views: 1321
- Fri Mar 28, 2008 4:02 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Error While Installing Datastage Enterprise edition 7.5x2
- Replies: 2
- Views: 1321
Error While Installing Datastage Enterprise edition 7.5x2
Hi,
We are trying to install datastate parallel edition 7.5x2 on windows. We are getting error as "Fail to set up server engine ERROR 1" . The set up is throwing this error at 26 % server installation completion , when it tries to configure server engine.
Please guide on same.
Thanks.
We are trying to install datastate parallel edition 7.5x2 on windows. We are getting error as "Fail to set up server engine ERROR 1" . The set up is throwing this error at 26 % server installation completion , when it tries to configure server engine.
Please guide on same.
Thanks.
- Wed May 30, 2007 6:55 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: wait for file stage
- Replies: 2
- Views: 1085
wait for file stage
hi in starting of sequence , i have wait for file stage. here if file is present then job1 should get executed then job2 should get executed and seq ends if file is not present job 2 should get executed. I am confused about the trigger conditions of wait for file stage. plz help and is there need to...