Search found 112 matches

by harryhome
Fri May 14, 2010 2:44 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Checking jobstatus
Replies: 4
Views: 1650

How to get Jobstarttime and Jobendtime for another job (not the same job where control tables are updated)? as DSJobStartTimestamp will give it for same job, but for others?
by harryhome
Fri May 14, 2010 2:37 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Checking jobstatus
Replies: 4
Views: 1650

Instead of writing script. Is there any way where the status of another job can be obtained and can be stored in the control table?
by harryhome
Fri May 14, 2010 1:36 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Checking jobstatus
Replies: 4
Views: 1650

Checking jobstatus

Hi, I have set of jobs which will be scheduled. Also a control table which stores the job status for each job on every run. When set of jobs will be running in a sequencer before each of those job run, a entry is made in cotrol table with few details like jobname,starttime,etc... Also will check fro...
by harryhome
Thu May 06, 2010 9:26 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: PATH search failure
Replies: 1
Views: 1684

PATH search failure

we are getting error as (while connectiong to oracle) main_program: PATH search failure: main_program: Error loading "liborchoraclent": Could not load "liborchoraclent": The specified module could not be found. . main_program: Could not locate operator definition, wrapper, or Uni...
by harryhome
Thu May 06, 2010 9:25 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: recovering install.liborchteradata
Replies: 5
Views: 2066

Thanks Ray. we are getting error as main_program: PATH search failure: main_program: Error loading "liborchoraclent": Could not load "liborchoraclent": The specified module could not be found. . main_program: Could not locate operator definition, wrapper, or Unix command for &quo...
by harryhome
Thu May 06, 2010 6:48 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: recovering install.liborchteradata
Replies: 5
Views: 2066

This file was frist as install.liborchteradata with unknown file format then when we changed it to install.liborchteradata.sh its file format got changed to .sh script Now were not able to figure out how to change it back to unknow format. As renaming is not possible, because the name is same as ins...
by harryhome
Thu May 06, 2010 6:22 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: recovering install.liborchteradata
Replies: 5
Views: 2066

recovering install.liborchteradata

Hi,

we have a problem
install.liborchteradata file is rename to install.liborchteradata.sh

we need to revert this file to original copy as now .sh file is not the correct one.

Is the any way to recover the file to unknownformat but not to .sh script format?
by harryhome
Thu May 06, 2010 4:31 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Job in running status, invoked again due to scheduler
Replies: 5
Views: 2690

Actually Job will not take 24 hrs normally but in worst case if data is huge then we need to know how it goes for next day schedule. If its not getting invoked then its status will not be aborted, right?
by harryhome
Thu May 06, 2010 3:58 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Job in running status, invoked again due to scheduler
Replies: 5
Views: 2690

Job in running status, invoked again due to scheduler

Hi

In 8.1, We are scheduling jobs to run at perticular time daily. What will happen if some job takes more than 24 hr on a particular, then in next schedule when it gets invoked again, it will be already in running state. what will happen to next run then?
by harryhome
Wed May 05, 2010 2:46 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Server is not responding
Replies: 4
Views: 1877

WebSphere Application Server is down, i tried to start it manually but again its getting down.

Any idea why?
by harryhome
Tue May 04, 2010 10:12 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Server is not responding
Replies: 4
Views: 1877

Server is not responding

Hi,

We are facing a issue while loging to the Datastage 8.0, getting an error as Server is not responding.

I checked the services "Datastage engine and Datastage telnet service", these are up.

Kindly let us know if there is any other service we need to check.

Thanks.
by harryhome
Mon Jun 16, 2008 3:58 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Case Study for Training
Replies: 4
Views: 2281

Case Study for Training

Hi,

Please give me some case study which can be used for training perposes.

Thanks.
by harryhome
Fri Mar 28, 2008 4:23 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Error While Installing Datastage Enterprise edition 7.5x2
Replies: 2
Views: 1321

Please ask if any other details required.
by harryhome
Fri Mar 28, 2008 4:02 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Error While Installing Datastage Enterprise edition 7.5x2
Replies: 2
Views: 1321

Error While Installing Datastage Enterprise edition 7.5x2

Hi,

We are trying to install datastate parallel edition 7.5x2 on windows. We are getting error as "Fail to set up server engine ERROR 1" . The set up is throwing this error at 26 % server installation completion , when it tries to configure server engine.

Please guide on same.

Thanks.
by harryhome
Wed May 30, 2007 6:55 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: wait for file stage
Replies: 2
Views: 1085

wait for file stage

hi in starting of sequence , i have wait for file stage. here if file is present then job1 should get executed then job2 should get executed and seq ends if file is not present job 2 should get executed. I am confused about the trigger conditions of wait for file stage. plz help and is there need to...