Search found 155 matches
- Thu Jun 19, 2014 8:29 am
- Forum: General
- Topic: Space issue for XMETA_DATA tablespace
- Replies: 9
- Views: 3666
- Wed Jun 18, 2014 9:30 pm
- Forum: General
- Topic: Space issue for XMETA_DATA tablespace
- Replies: 9
- Views: 3666
I did an immediate purge for as many as 75 jobs and then queried the free space in XMETA_DATA tablespace. It has not claimed any space. That leaves an impression that the job logs are not stored in XMETA. How can I check whether the logs are stored in XMETA? I checked the Information Server Web Cons...
- Wed Jun 18, 2014 3:36 pm
- Forum: General
- Topic: Space issue for XMETA_DATA tablespace
- Replies: 9
- Views: 3666
- Wed Jun 18, 2014 12:59 pm
- Forum: General
- Topic: Space issue for XMETA_DATA tablespace
- Replies: 9
- Views: 3666
Space issue for XMETA_DATA tablespace
Hello all, We are seeing issues with XMETA_DATA tablespace in the Dev Data Stage server. Only 1% is free and even after DBA adding 800M to the tablespace, it is used up quickly. I removed lot of test jobs that team created, but when I query the available space it did not have any change. What are th...
- Tue Feb 12, 2013 8:16 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Scenario with Switch stage
- Replies: 1
- Views: 1664
Scenario with Switch stage
Hi, I have been trying a scenario using Switch stage, though this is not ideal case. The source stage prior to switch brings in a record whose Selector column value is defined in Case with a corresponding output link. I have also set Discard value as the Selector column value set via Case above. In ...
- Thu Jan 24, 2013 1:44 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Rewriting Server jobs in 7.5.1 as parallel jobs in 8.1
- Replies: 4
- Views: 2547
Rewriting Server jobs in 7.5.1 as parallel jobs in 8.1
Hello, For a Data Stage upgrade project, we have to convert a large number of Server jobs to be rewritten as Parallel job. Due to the time crunch for the project, we are even considering whether there are any tools in the market (with aproximate cost ) that can do the conversion. We will then be abl...
- Mon Nov 19, 2012 9:08 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Performance improvement for reading a file via FTP Plug-in
- Replies: 8
- Views: 3374
- Mon Nov 19, 2012 7:53 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Performance improvement for reading a file via FTP Plug-in
- Replies: 8
- Views: 3374
I ran the job in both ways 1. Have the job FTP the file and write to peek stage. In this case the rows processed per second was 10148. 2. Have the job FTP file, pass to transformer stage where the columns are mapped through substrings function and write to a dataset. Here the rows processed per seco...
- Mon Nov 19, 2012 3:30 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Performance improvement for reading a file via FTP Plug-in
- Replies: 8
- Views: 3374
Performance improvement for reading a file via FTP Plug-in
Hello, I am using FTP Plug-in stage to read a file from Mainframes server into the Data Stage server. The job has a FTP Plug-in stage and then in teh transformer stage, I am mapping each column using substrings function. There are 1.4 million records in the file and it takes 70 minutes to complete t...
- Fri Nov 09, 2012 1:22 am
- Forum: General
- Topic: Issue with stopped jobs by terminate sequence
- Replies: 7
- Views: 4924
- Thu Nov 08, 2012 4:03 am
- Forum: General
- Topic: Issue with stopped jobs by terminate sequence
- Replies: 7
- Views: 4924
- Thu Nov 08, 2012 3:10 am
- Forum: General
- Topic: Issue with stopped jobs by terminate sequence
- Replies: 7
- Views: 4924
Sorry if the post was vague. The question is why the rerun of the master sequence gets aborted indicating that there are stopped jobs in child sequence that it executed in the the previous run. I would expect that when the Execute Action is mentioned that reset if required, then run then all the sto...
- Wed Nov 07, 2012 4:27 am
- Forum: General
- Topic: Issue with stopped jobs by terminate sequence
- Replies: 7
- Views: 4924
Issue with stopped jobs by terminate sequence
I am seeing an issue with rerun of sequence job (with few new business logic implented) which got aborted forcefully by terminate sequence activity. This is how the job flows. A master sequence sequence job executes 4 jobs. Our of these, 2 jobs unconditionally trigger a sequence job. There are 2 oth...
- Mon Oct 29, 2012 12:01 am
- Forum: General
- Topic: Issue with notification activity stage
- Replies: 6
- Views: 3392
- Sat Oct 27, 2012 9:11 am
- Forum: General
- Topic: Issue with notification activity stage
- Replies: 6
- Views: 3392