Search found 37 matches

by Nsg
Tue Feb 28, 2006 9:40 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Wait for directory to have file(s)
Replies: 14
Views: 5445

thanks all of your your response, and sorry for not being able to correspond ... The wild card option, as everyone tested doesnot work, I hope some derivations could be made or some parameter can be passed while running the master sequencer... if you have any suggestions please let me know thanks al...
by Nsg
Mon Feb 27, 2006 1:47 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Wait for directory to have file(s)
Replies: 14
Views: 5445

Wait for directory to have file(s)

I have a sequencer where the starting point is wait for file activity ,,, i have specified a path name and file name and only when that file appears the job runs... but if the need is to start the job whenever file(s) land(appear) in a particular directory trigger the job ,,, can this be done ,,, go...
by Nsg
Tue Feb 07, 2006 9:39 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: warning message handling
Replies: 2
Views: 1256

warning message handling

I am running a job where i know there are going to many warnings of null in not nullable field - unique priary index and those records need to be collected in a reject file ,,, i want to have a warning message but not 100 thousands of the same warnings....now the options i have are 1. give a constra...
by Nsg
Tue Feb 07, 2006 9:14 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Rerunning a failed sequencer
Replies: 4
Views: 2070

rasi wrote:Hi

On top of my head I never heard that we can do this setting on a project level. I am using the checkpoint in the sequence level which works fine

can u tel me how this check point works and what benifits does it have
by Nsg
Tue Feb 07, 2006 5:52 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Rerunning a failed sequencer
Replies: 4
Views: 2070

Rerunning a failed sequencer

HI, I am running a sequencer on 7.5 Px where i am calling in multiple jobs and sub sequences. I need to design/develop in such a way that whenever a job aborts and after that when it is restarted it starts from where it failed/stopped. eg- there are 7 processes , 4 ran well and the seq failed at 5th...
by Nsg
Wed Feb 01, 2006 11:59 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Trigger type in sequencer
Replies: 5
Views: 2019

Thanks

I got a lot of information from the earlier posted question.
and I am going to use the expression <jobstatus>

Thanks a Lottttttttttt
by Nsg
Wed Feb 01, 2006 11:22 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Trigger type in sequencer
Replies: 5
Views: 2019

Trigger type in sequencer

I am working on job flow through sequencer , in the triggers I want to give a trigger such that the next job is triggered when the previous job finishes - with or without warnings . Conditional - ok Conditional - Warnings both of then will not work ,as i want both conditions in one I guess Condition...